                                                            SWMS:16 – Working Around Concrete Trucks & Placement Booms
Project Details

Project:                                71 SEAVIEW TCE SUNSHINE BEACH QLD 4567                                                     Responsible Person:          Matt Leeke 0414 691 314
                                                                                                                                   Site Manager:                Matt Leeke 0414 691 314
                                                                                                                                   Site Foreman :               Terry Strahan 0419 762 427
                                        Working around concrete trucks and concrete placing booms to place concrete in             Site Foreman :               Jesse Joyce 0403 745 840
Activity Description:
                                        various form work, block walls, columns and ground excavations
                                                                                                                                   HSO:                         Terry Strahan 0419 762 427

Referenced SWMS:                        SWMS 04

Plant and Equipment Involved:           Concrete truck, placing boom, vibration shafts lasers, shovels, trowels and screed
                                                                                                                                                                   energised electrical installations
                                        Work at Heights >2m                   Disturbance of asbestos                   Confined spaces
                                                                                                                                                                   or services
High Risk Activities:                                                         Structural alterations requiring          Excavation >1.5 metres or near a           a contaminated or flammable
                                        Demolition of a structure
Carried out in or near the following:                                         temporary support                         tunnel                                     atmosphere
                                        A work area with moving               water or other liquid that
                                                                                                                        tilt-up or precast concrete                Other: ____________________
                                        powered mobile plant                  involves a risk of drowning
PPE Required:                           Hard Hat                      Safety glasses / goggles          Hearing Protection                Fall Arrest Harness              Disposable overalls:
(Tick as relevant)                      Safety Boots                  Face Shield                       Gloves                            Respirator                       High Visibility Vest
                                        Inspection and maintenance of concrete pumps & booms:
Maintenance / Prestart Checks
                                          daily / pre-operational
Required:
                                          weekly
                                          monthly
                                          3-monthly
                                          1-yearly
                                          6-yearly
                                        OHSCER236A – Operating Concrete Placing Booms
Certificates of Competency
Required:
                                         Induction into this SWMS
Training / Competencies Required:
                                         Site Specific Induction
                                         General Safety Induction
                                        Work Health & Safety Regulations 2011 – Part                                               Code of Practice – Pumping Concrete (QLD & NSW)
Health, Safety or Environmental                                                                Codes or Standards
                                        5.1, Subdivision 3 & Part 4.5                                                              VIC Industry Standard – Concrete Pumping
Legislation:                                                                                   Applicable to the Works:
                                        VIC OH&S Reg Part 3.5
584 Milton Road TOOWONG QLD 4066                              SWMS Developed by:     Jamie Gilbert                                                                      VERSION 6 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                           Position:              National Health & Safety Co-ordinator                                                                  Page 3
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.