SWMS:17 – Operating Mobile Plant (General)
Safe Work Methods
Responsible Residual
H Controls / Work Methods
Person/s for Risk
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Monitor & L C R
C 5. Admin 6. PPE Review
Contact with overhead power C 5 E 1 No part of the mobile plant or person / equipment etc., Hutchinson D 5 E
lines 22 is to enter a power line exclusion zone. Note: This is 3m Builders Site 19
minimum for low voltage, if unsure check with site Foreman
manager.
Refer to SWMS:29 Working with Overhead Power Plant Operator
lines
Contact with underground C 5 E 5 No excavation / digging work is to commence prior to Hutchinson D 5 E
services 22 the operator receiving (in writing) the prescribed Builders Site 19
information regarding the location of all underground Foreman
services on site.
Refer to - SWMS: 07 Excavations & Trenching. Plant Operator
Striking other plant / C 5 E 3 If working in areas exposed to site traffic – adequate Hutchinson E 5 H
structures / workers 22 exclusion zones erected or public roads – as per the Builders Site 15
road management plan. Foreman
5 Ensure travel alarms and flashing warning lights are
working. Plant Operator
5 No person is to enter into the operating zone of mobile Workers
plant without first establishing contact with the
operator.
6 Operators and workers are to wear high visibility vests.
Where there is a potential for mobile plant to contact
scaffolding, formwork, tilt-up panel bracing or similar
3 load bearing structures, appropriate barricading must
be installed / erected to prevent mobile plant access
to the immediate area, or protect the structure from
such collisions.
Operators are not to operate plant at excessive
speeds, fast turns or stops
5
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 6 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 14
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.