SWMS:18 – A Pre Cast Panel Erection – N/A
Safe Work Methods
Responsible
H Controls / Work Methods Residual Risk
Person/s for
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Monitor & L C R
C 5. Admin 6. PPE Review
C 4 E 4 Panels are to be designed by an engineer with Hutchinson D 4 H
Planning for the work and Pre - Improper design of panels for
18 consideration given to both the loads imposed on the Builders Site 14
Cast panel design erection and in service loads
panels during erection and lifting, as well as when the Foreman
panels are part of the final structure.
Obtain design engineer drawings for panel design, Design
drawings for panel erection and engineer sign Engineer
5
off/certification letter of panel design. The drawings are
to cover items such as:
- Design of the panel itself for the in-situ application
as part of the final structure;
- Design of the panel for lifting and other installation
loads;
- Layout of the panels during construction of the
building or structure with temporary bracing
installed; and
- Layout of the building or structure in its completed
form with temporary bracing removed and
permanent connection detailed.
C 4 E 4 Deadmen are to be designed by an engineer and Hutchinson D 4 H
Improper design of deadmen
18 drawings are to be kept on site outlining the Builders Site 14
dimensions, concrete strength, steel content and Foreman
location, terrain category (for wind) and soil type.
Written verification is to be obtained from an engineer Design
4
outlining that the deadmen are able to resist wind Engineer
loadings on the panels (in accordance with AS 1170.
Preparation of the deadmen Falls into excavations / bore C 4 E 3 Excavations are to be suitably barricaded (1 metre back Hutchinson D 4 H
including installation pier 18 from the edge) to restrict access to the area Builders Site 14
Bore piers are to be back filled (with concrete) as soon Foreman
4 as possible or place a suitable cover over.
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 9 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 20
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.