Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 340, section 1. The text section number identifies this passage in the reader.

                                                                      SWMS: 21 – Swing Stage Suspended Scaffolds - N/A
Project Details
Project:                                71 SEAVIEW TCE SUNSHINE BEACH QLD 4567                                           Responsible Person:                     Matt Leeke 0414 691 314
                                                                                                                         Site Manager:                           Matt Leeke 0414 691 314
                                                                                                                         Site Foreman :                          Terry Strahan 0419 762 427
Activity Description:                   Performing work using a swing stage suspended scaffold                           Site Foreman :
                                                                                                                         HSO:                                    Terry Strahan 0419 762 427
Referenced SWMS:                        SWMS15 – SWMS 20
Plant and Equipment Involved:             Swing stage cradle, hoist and associated equipment
                                          Personal fall arrest harness and associated equipment
                                                                                                                                                                    energised electrical installations
                                        Work at Heights >2m                   Disturbance of asbestos                    Confined spaces
                                                                                                                                                                    or services
High Risk Activities:                                                          Structural alterations requiring          Excavation >1.5 metres or near a           a contaminated or flammable
                                        Demolition of a structure
Carried out in or near the following:                                          temporary support                         tunnel                                     atmosphere
                                        A work area with moving                water or other liquid that
                                                                                                                         tilt-up or precast concrete                Other: ____________________
                                        powered mobile plant                   involves a risk of drowning
PPE Required:                           Hard Hat                      Safety glasses / goggles           Hearing Protection                Fall Arrest Harness              Wrist Straps:
(Tick as relevant)                      Safety Boots                  Face Shield                        Gloves                            Respirator                       High Visibility Vest
Maintenance / Prestart Checks               Fall arrest harnesses and associated equipment to be inspected prior to use and minimum 6-monthly by a competent person.
Required:                                   Inspection and maintenance of the swing stage in accordance with the manufacturers / engineers / competent persons recommendations and
                                             inspected at least:
                                           -     before first use;
                                           -     prior to each day’s use;
                                           -     immediately following any disturbance or major weather impact that might reasonably be expected to affect the stability of the scaffold or
                                                 supporting structure;
                                           -     following any repairs and modifications; and
                                           -     Intervals not exceeding thirty (30) days.
Certificates of Competency               (SA) Advanced Scaffolder Certificate                                                 Completed Safe Use of Swing Stage – course (30826 QLD)
Required:                                Completed Safe Installation of Swing Stage Scaffold - course (30825 QLD)
Training / Competencies Required:            Induction into this SWMS                Suspended Scaffold User’s Certificate under the National Certification System (when available)
                                             General Safety Induction                Training in inspection, use and maintenance of fall-arrest harnesses & rescue (where applicable
                                             Site Specific Swing Stage               Safe use of Swing Stage Scaffold (30826QLD) (Where applicable)
                                              Induction
Health, Safety or Environmental         Work Health & Safety                 Codes or Standards         Scaffolding Code of Practice 2009
Legislation:                            Regulation 2011, Part 5.3,           Applicable to the          AS/NZS 4576: Guidelines for Scaffolding
                                                                                                        AS 1576.1: Scaffolding – General Requirements
                                        Chapter 6                            Works:                     AS 1576.4: Scaffolding – Suspended Scaffolds
                                        VIC OH&S Act 2004,                                              AS 1891.4: Industrial Fall Arrest Systems and Devices
                                                                                                         QLD Code of Practice – Managing the Risk of Falls at Workplace – 2011
                                                                                                         NSW Code Of Practice – Managing The Risk Of Falls At Workplace – 2011
                                                                                                         TAS Code Of Practice – Managing The Risk Of Falls At Workplace -2012
584 Milton Road TOOWONG QLD 4066                              SWMS Developed by:     Jamie Gilbert                                                                       VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                           Position:              National Health & Safety Co-ordinator                                                                  Page 52
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.