                                                                   SWMS: 21 – Swing Stage Suspended Scaffolds - N/A
Safe Work Methods
                                                                                                                                                           Responsib       Residual
                                                                                                                                                                le           Risk
                                                                                    H                    Controls / Work Methods                            person/s       L C R
            Job Steps                   Potential Hazards           L    C      R   O           1. Eliminate 2. Substitute 3. Isolate 4. Engineer
                                                                                                                5. Admin 6. PPE                                for
                                                                                    C
                                                                                                                                                           Monitor &
                                                                                                                                                             Review
Prior to operation                    Non-competent                 B    5      E   5        Prior to the use of a swing stage suspended scaffold, all    Hutchinson      E    5       H
                                      operators / faulty                        2             relevant forms / checklists are to have been completed       Builders Site                1
                                      equipment                                 4             by Hutchinson Builders, in accordance with the Project       Foreman                      5
                                                                                              Risk Assessment, to verify all applicable documentation,
                                                                                              sign-offs etc, relating to the installation of the swing     Advanced
                                                                                              stage have been sighted.                                     Scaffolder
                                                                                    5        Only an advanced scaffolder (under the national
                                                                                                                                                           Swing Stage
                                                                                              certification system) who is competent in the installation
                                                                                                                                                           Operators
                                                                                              of swing stage systems is to install suspended scaffolds.
                                                                                    5         Operators MUST have completed and understand
                                                                                               the operation induction process for swing stages
                                                                                               before operating or working in the swing stage, and
                                                                                               are to hold a Suspended Scaffold User’s Certificate
                                                                                               under the National Certification System (when
                                                                                               available).
                                                                                    5        The Swing Stage Daily Safety Checklist is to be completed
                                                                                              by operators each day prior to use eg; rostrum, (provided
                                                                                    3         by the supplier).
                                                                                             Ensure exclusion zones are in place to isolate others from
                                                                                              below the operational area
Accessing the cradle                  Inappropriate means of        C    3      H   5       Safe access to the cradle is to be provided at ground         Hutchinson      D    3       M
                                      access / falls from height                1            level or position in and area that the user is not            Builders Site                9
                                                                                3            exposed to injury.                                            Foreman
                                                                                    4       Access to the cradle is to be via the manufacturer
                                                                                             provided gate.                                                Swing Stage
                                                                                    5       Approaches to the suspended scaffold are to be                Operators
                                                                                             adequately illuminated by either natural or artificial
                                                                                             light.
Working from within the cradle        Falls from heights            B    5      E   4-      All persons within the cradle are to wear fall arrest         Swing Stage     D    4       H
                                                                                2   6        harnesses attached to the manufacturer provided               Operators                    1
                                                                                4                                                                                                       4
584 Milton Road TOOWONG QLD 4066                           SWMS Developed by:   Jamie Gilbert                                                              VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                        Position:            National Health & Safety Co-ordinator                                                         Page 54
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.