                                                                                  Hutchinson Builders – ABN:52 009 778 330

                                    WHSMP:01 – Work Health & Safety Management Plan
                                                                                                                Version: 9.2



      10.4 Rehabilitation & Return to Work
The Rehabilitation and Return to Work (RRTW) process for internal employees will be conducted by the HB
RRTW Coordinator. The RRTW Coordinator will manage injury in accordance with the WorkCover approved
Rehabilitation and Return to Work Policies and Procedures. Workers Compensation for internal employees
will be applied for by the injured worker and managed by HB. Where the regulator stipulates informative
material is to be included on site.
HB Safety/Rehabilitation personnel will assist injured persons with the following:
             liaising with worker’s nominated treating doctor regarding suitable/alternate duties which are
              available at HB work sites;
             development and implementation of a HB Return to Work Plan;
             Completion of workers compensation forms

10.5 Record Keeping
Following the administration of first aid treatment a record is to be maintained on the Minor first aid register.
For all incident / injury / near miss an incident report form is to be completed and forwarded to the Project
Management Team along with the corporate HSE Team. The records of any investigation are to be
maintained for a period of not less than seven (7) years.

10.6 Health and Safety Reporting

Each month the Project Manager (or nominated person) is responsible for the completion & distribution of
the site’s Monthly Project Performance Report HB-HSEQ-F-049 Project Performance, to the Corporate
WHS&E Manager. Reports are submitted through the Team Safety Manager and are required to be submitted
by the second Friday of the next month. The report records man hours, incidents; an inspection completed
etc. and allows the HB Corporate Safety section to prepare LTIFR, TRIFR etc. statistics.




                                                                                                              Page 35 of 58

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.