                                                                                     SWMS:22 – Kwik Stage Scaffolds
Safe Work Methods
                                                                                      H                    Controls / Work Methods                           Responsible        Residual
             Job Steps                     Potential Hazards           L    C    R    O            1. Eliminate 2. Substitute 3. Isolate 4. Engineer         Person/s for         Risk
                                                                                      C                             5. Admin 6. PPE                        Monitor & Review    L    C      R
                                                                                                    Only a licenced scaffolder is to erect a scaffold
                                                                                              where a person can fall 4 metres or more, and
                                                                                              scaffolds from the ground level if the height of the final
                                                                                              structure will be more than 4 metres.
                                                                                                    Ensure that the scaffold is based out as per the
                                                                                              scaffold plan.
                                                                                                    Ensure that the sole boards and base plates are
                                                                                              level and bearing on stable and solid ground.
                                                                                                    Ensure that base plates or not protruding over
                                                                                              the side of sole boards or side of a supporting structure
                                                                       B    5     E    3            Barricade off the area to exclude others from
Erection, alteration and dismantling   Falls from heights
                                                                                 24           the erection area.                                                               E    4      H
a Kwik stage scaffold (cont.)
                                                                                       4            Install bracing and ties to the scaffold as you       Licenced                        1
                                                                                              erect the bays and increase the height of the scaffold       Scaffolder /                    0
                                                                                              in accordance with the scaffold plan.                        Competent Person
                                                                                       5            Always work off two planks (450 wide) when
                                                                                              erecting to a height above.
                                                                                       4
                                                                                                    NEVER expose yourself to a fall of more than 2
                                                                                              metres etc.; every alternate scaffold deck is to be fully
                                                                                              planked out to stop falls over 2 metres or.
                                                                                                    If alternate decks are not installed a harness
                                                                                       6
                                                                                              attached to the scaffold is to be worn to prevent falls
                                                                                              when working inside the scaffold frame
                                                                                       4            Provide handrails, kick boards, brick guards or
                                                                                              perimeter lining as you go to maintain a safe work
                                                                                              area.
                                                                                       4            Erect a ladder for safe access to the working
                                                                                              deck or when required, climb the inside of the scaffold
                                                                                              to reach the next deck provided that you have a full
                                                                                              scaffold deck below when climbing to the deck
                                                                                              position above – ensuring that hand rails are in place.
584 Milton Road TOOWONG QLD 4066                            SWMS Developed by:   Jamie Gilbert                                                                VERSION 8 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                         Position:            National Health & Safety Co-ordinator                                                           Page 64
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.