SWMS:23 – Traffic Control
Safe Work Methods
H Controls / Work Methods Responsible Residual
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Person/s for Risk
C 5. Admin 6. PPE Monitor & Review L C R
B 4 E 5 Where construction activities require that Hutchinson Builders
Planning to undertake works Failure to adequately prepare
21 vehicular traffic be impeded, a Traffic Foreman D 3 M
requiring traffic control for works requiring traffic
Management Plan will be developed by a 9
control
reputable Traffic Management Company Traffic Management
(TMC). Company
All tasks involving Traffic, Roadway and
5 Footpath Management to be developed and
on site before work starts.
Traffic Controllers
Where the altered roadway/path cannot be
3-
appropriately controlled through the use of
5
safety barriers and signage alone, traffic
controllers will be provided to direct vehicles
and pedestrians and where vehicles or plant
are required to reverse across populated public
footpaths or walkways to enter or exit the site,
shall require either a spotter or mechanical
aids to control the safe movements of
pedestrians.
A 5 E 5 Only certified Traffic Controllers will be Hutchinson Builders
Undertaking traffic control activities Non-competent traffic
25 permitted to undertake traffic control Foreman
control personnel
functions on site. C 3 H
Note: traffic control certification must have been 13
obtained within the particular state/territory where
the work is to be undertaken.
Traffic controllers will be inducted into the
Traffic Management Plan for the site. Traffic Controllers
All other workers who are required to work on
or adjacent to, a road are to be provided with
training in the basic requirements of the site Workers working on
Traffic management Plan. / adjacent to a road
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 71
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.