SWMS:23 – Traffic Control
Safe Work Methods
H Controls / Work Methods Responsible Residual
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Person/s for Risk
C 5. Admin 6. PPE Monitor & Review L C R
A 5 E 5 Signs and devices will be erected and displayed Traffic Controller
Undertaking traffic control activities Inappropriate use /
25 by the Traffic Controller before work Site team C 3 H
(cont.) placement of signage and /
commences in accordance with the Site Traffic 13
or traffic control devices
Management Plan (STMP).
Signs and devices must not direct a motorist to
disobey the traffic regulations, unless an Traffic Controller
authorised person / traffic controller is Site team
present to direct traffic.
A daily check of all signs and devices will be
undertaken by the traffic controller / site team
before work starts each day and in accordance
Traffic Controllers
with the STMP layout. Hutchinson Builders is
to also undertake daily inspection of signs and
devices and keep records. Note: refer to annex
1 for an example of a Daily Checklist that may be
used to document daily checks.
The site team is to maintain barriers, signs and
tapers as necessary and in accordance with the
Site team
STMP.
Traffic Controller
Signs and devices will be removed from a work
site by the traffic controller/site team only
after all work is completed and as soon as
practicable after completion of works.
B 4 E 5 Ensure that the Traffic Controller Ahead / Hutchinson Builders
Worker(s) being struck by
21 Prepare to Stop sign is erected correctly prior Foreman C 3 H
motor vehicle
to starting work. 13
Traffic directed through a work site is to have
an approach speed in accordance with the Traffic Controllers
Vehicles travelling at
excessive speed Traffic Management Plan.
Ensure during the reversing of vehicles or plant
Site team
across public footpaths and walkways to enter
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 72
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.