SWMS:23 – Traffic Control
Safe Work Methods
H Controls / Work Methods Responsible Residual
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Person/s for Risk
C 5. Admin 6. PPE Monitor & Review L C R
or exit sites that adequate controls (spotter or
mechanical aids) are in place to control the
safe movements of pedestrians before the
movement of plant and vehicles commence.
B 4 E 5 The site team is to periodically check through Traffic Controller
Undertaking traffic control activities Failure to ensure traffic
21 the work site to check that all signs, markings Site foreman C 3 H
(cont.) control signage and devices
and delineating devices as seen by other road 13
remain in place and are
users are satisfactory and in their correct
clearly visible
position.
C 4 E 5 Traffic Controllers are to: Traffic Controllers
Functional impairment due
18 maintain a zero blood alcohol D 3 M
to alcohol and/or other drugs
concentration while performing traffic 9
/ medication
control functions; and
not to perform traffic control functions
Distraction due to mobile whilst adversely affected by a drug, or
phone use other medication, causing functional
impairment.
not to use mobile phones in any
circumstances whilst directing traffic.
A 4 E 5 At least two (2) workers will work at any time Hutchinson Builders
Working in low light or at night Worker(s) being struck by
23 in low light or night time conditions. Foreman D 3 M
motor vehicles
4 Additional lighting will be provided as 9
necessary.
Inadequate lighting Workers will wear florescent and / or retro-
6 Traffic Controllers
reflective clothing including vests and gaiters.
A 3 E 5 Undertake a pre-closedown inspection at the Traffic Controller
Closing down at the end of the day Failure to ensure suitable
20 end of each day’s work. D 2 L
traffic control signage and
Remove Traffic Controller Ahead / Prepare to Site team 5
devices are removed or kept
5 Stop, Workers (symbolic) and other
in place
inappropriate signs and devices.
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 73
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.