SWMS:24 – Working with Explosive Power Tools
Safe Work Methods
H Controls / Work Methods Responsible Residual
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Person/s for Risk
C 5. Admin 6. PPE Monitor & Review L C R
Plan the position of casting Expose workers to being B 4 E 5 Safe work methods of plant operator and panel Employer D 4 H
beds and crane access; struck by plant 21 crew to be on site. Site Foreman 14
Level, trim and fill for casting movements causing Workers to be aware of plant movements.
bed death or serious bodily Workers to be eye contact with operator when
Prepare site access for injury. working close by.
concrete trucks and crane Operators to be certificate holders for that plant
Pour casting beds Expose workers to being B 4 E 5 Safe work method of concreter to be on site. Worker D 4 H
struck by plant 21 Workers to be aware of plant movements. 14
movements causing Be aware of SWMS No.16
death or serious bodily Concrete placed by experienced personal.
injury.
Expose workers to back
injury placing concrete.
Construct panels; Expose workers to C 4 E 5 Take care in lifting and bending to safe your back, Worker D 3 M
Cutting formwork install lifter incorrect manual 18 refer SWMS No.04. 9
and brace ferrules, place reo handling movements Take care carrying materials near other workers, so
steel and form openings and causing bodily injury. not to place them at risk.
finish edging to shop DWG’s Expose other workers Place waste materials onto bins provided or in
when carrying steel reo orderly stack piles.
causing bodily injury.
Spray formed panel area with Expose workers to B 3 H 5 Train workers in the safe handling as per SDS Worker D 2 L2
Bond Breaker agent absorption, inhalation, 17 Apply wearing adequate P.P.E. as per SDS. Foreman
and splashes of liquid Store liquid in a controlled area.
causing illness. Wash hands before eating and finished using.
Using electrical tools and Expose workers to C 4 E 5 All equipment to be connected to a power box Employer
equipment electrical shocks causing 18 protected by a RCD. Site Foreman M
serious bodily injury. All tools and equipment to be tested and tagged D 3
9
every 3 months.
Correct placement of steel and Expose workers to panel C 5 E 5 Engineer and or competent person inspect Worker
H
associated materials failure during lift and 22 placement of all material installed, as per Foreman E 5
15
brace sequence causing engineer’s DWG’s.
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 6 – May 2014
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 88
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.