                                                                           SWMS:24 – Working with Explosive Power Tools
Safe Work Methods
                                                                                          H                   Controls / Work Methods                        Responsible            Residual
            Job Steps                     Potential Hazards            L    C     R       O           1. Eliminate 2. Substitute 3. Isolate 4. Engineer      Person/s for             Risk
                                                                                          C                            5. Admin 6. PPE                     Monitor & Review        L C R
Plan the position of casting             Expose workers to being      B    4      E      5        Safe work methods of plant operator and panel         Employer                 D    4   H
beds and crane access;                    struck    by      plant                 21                crew to be on site.                                   Site Foreman                      14
 Level, trim and fill for casting        movements       causing                                  Workers to be aware of plant movements.
    bed                                   death or serious bodily                                  Workers to be eye contact with operator when
 Prepare site access for                 injury.                                                   working close by.
    concrete trucks and crane                                                                      Operators to be certificate holders for that plant
Pour casting beds                        Expose workers to being      B    4      E      5        Safe work method of concreter to be on site.          Worker                   D    4   H
                                          struck       by      plant              21               Workers to be aware of plant movements.                                                 14
                                          movements         causing                                Be aware of SWMS No.16
                                          death or serious bodily                                  Concrete placed by experienced personal.
                                          injury.
                                         Expose workers to back
                                          injury placing concrete.
Construct panels;                        Expose      workers     to   C    4      E      5        Take care in lifting and bending to safe your back,   Worker                   D    3       M
 Cutting formwork install lifter         incorrect         manual                18                refer SWMS No.04.                                                                           9
   and brace ferrules, place reo          handling      movements                                  Take care carrying materials near other workers, so
   steel and form openings and            causing bodily injury.                                    not to place them at risk.
   finish edging to shop DWG’s           Expose other workers                                     Place waste materials onto bins provided or in
                                          when carrying steel reo                                   orderly stack piles.
                                          causing bodily injury.
Spray formed panel area with             Expose      workers     to   B    3     H       5        Train workers in the safe handling as per SDS         Worker                   D    2       L2
Bond Breaker agent                        absorption, inhalation,                 17               Apply wearing adequate P.P.E. as per SDS.             Foreman
                                          and splashes of liquid                                   Store liquid in a controlled area.
                                          causing illness.                                         Wash hands before eating and finished using.
Using electrical tools and               Expose      workers     to   C    4      E      5        All equipment to be connected to a power box          Employer
equipment                                 electrical shocks causing               18                protected by a RCD.                                   Site Foreman                          M
                                          serious bodily injury.                                   All tools and equipment to be tested and tagged                                D    3
                                                                                                                                                                                                9
                                                                                                    every 3 months.
Correct placement of steel and           Expose workers to panel      C    5      E      5        Engineer and or competent person inspect              Worker
                                                                                                                                                                                            H
associated materials                      failure during lift and                 22                placement of all material installed, as per           Foreman                  E   5
                                                                                                                                                                                            15
                                          brace sequence causing                                    engineer’s DWG’s.
584 Milton Road TOOWONG QLD 4066                             SWMS Developed by:        Jamie Gilbert                                                                     VERSION 6 – May 2014
P: (07) 3335 5000 F: (07) 3335 5005                          Position:                 National Health & Safety Co-ordinator                                                          Page 88
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.