SWMS:26 – Demolition of Structures - N/A
Safe Work Methods
H Controls / Work Methods Responsible Residual
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Person/s for Risk
C 5. Admin 6. PPE Monitor & Review L C R
Plan for the protection during Exposing members of B 5 E 3 Building to Hoarding Fence that complies to; Competent Person D 3 M
demolishing process the public to falling or 2 o Greater than 2H of building 1.8metre wire fence. 9
Adjoining public areas flying objects causing 4 o Less than 2H of building 1.8metre solid fence. Site manager
Working at heights adjoining death or serious bodily o Less than 0.5H of building gantry protection.
public areas injury 5 Provide as required traffic controllers to safely direct
Entry and Exit into site Expose members of the trucks and equipment to and from site.
Working with hazardous public to being struck by Erect “Warning demolition in Progress” sign.
substances trucks and machinery 5 Action the following high risk checklists;
coming onto site causing 5 - Demolishing Work on Structures
death or serious bodily - Removal of Asbestos Materials
injury
Expose members of the
public and workers to
Asbestos fibres
Disconnect existing affected Expose workers B 5 E 5 Arrange a site meeting with relevant trades persons to Site foreman D 3 M
services from building to be disconnecting services to 2 identify service utilities to be removed 9
demolished risk of injury whom are 4 Engaged qualified trades persons to Isolate or Competent person
Isolate water not qualified to do so. disconnect their respective services.
Isolate gas Expose workers to injury Qualified trades persons to sign off on the services
Isolate sewer or serious bodily injury they have isolated or disconnected
Isolate ground drainage during demolishing from Temporary power to be provided where required.
Isolate Electrical live services
Other services i.e. lifts, air
conditioning
Manual demolition and removal Expose workers to; B 4 E 5 Use the correct hand tools and electrical equipment Competent Person D 3 M
of: o Cuts and lacerations 2 to remove the selected fixtures from the installed 9
White goods, doors and general o Strain and pulled 1 6 position.
hard ware items to all levels muscles 5 Use adequate P.P.E. to carry out the task.
o Head injuries Use correct lifting methods to lift fixtures and place in
o Eye injuries 5 the storage area.
Store fixtures in an orderly manner.
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 98
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.