                                                                            SWMS:26 – Demolition of Structures - N/A
Safe Work Methods
                                                                                        H                    Controls / Work Methods                            Responsible          Residual
             Job Steps                      Potential Hazards           L   C   R       O            1. Eliminate 2. Substitute 3. Isolate 4. Engineer          Person/s for           Risk
                                                                                        C                             5. Admin 6. PPE                         Monitor & Review   L      C    R
   Remove glass panels, windows           Expose     workers     to   B   4   E      5         Assess the size of the glass and frame to be removed        Employer           D     3     M
    and aluminium framing to all            shattering glass when               2                 and gain assistance if required from another worker         Site Foreman                   9
    levels                                  removing panes from                 1                 to secure the glass as the rubbers are removed.             Exper/Worker
                                            sections causing cuts and                  4         Using glass suction lifting aids and gauntlet gloves
                                            lacerations.                                          remove the glass and place it in the area provided.
                                                                                       4         Using hand tools remove aluminium sections and
                                                                                                  place in the area provided.
                                                                                       4         If required to work at height set up a stable work
                                                                                                  platform (mobile scaffold or trestle).
                                                                                       1         Do not work at the edge of the floor or building where
                                                                                                  you are exposed to a fall from heights.
                                                                                       1         Do not work off an extension ladder.
   Remove plaster, timber, metal          Expose workers to;          B   4   E      5         Use the correct hand tools and electrical equipment         Competent Person   D      3    M
    ceilings and walls at all levels        o Cuts and lacerations              2                 to remove the selected fixtures from the installed                                         9
                                            o Strain and pulled                 1                 position.
                                                muscles                                6         Use adequate P.P.E. to carry out the task.
   Remove allied service pipes,            o Head injuries                            5         Use correct lifting methods to lift fixtures and place in
    wiring, ducts and conduits at all       o Eye injuries                                        the storage area.
    levels                                                                             5         Store materials in the area provided.
                                                                                       4         If required to work at height set up a stable work
                                                                                                  platform (mobile scaffold or trestle)
                                                                                       1         Do not work at the edge of the floor or building where
                                                                                                  you are exposed to a fall from heights
                                                                                       1         Do not work off an extension ladder.
                                         Workers exposed to            B   4   E      5         Where practicable place materials into a lift box and       Competent person   C      4    E
 Remove reusable materials from          strained and pulled                   2                 lower to the ground using a crane.                                                         1
  all levels                              muscles    caused    by               1      4         Where practicable use existing lift or install a man and                                   8
                                          continuous carrying and                                 materials hoist to lower to the ground.
                                          lifting.                                     5         Walk the materials down stairwells to a limit of 3
                                                                                                  levels per person.
   Remove generated rubbish and           Workers exposed to falls    B   4   E      4         Provide purposed built chutes to direct rubbish and         Competent Person   D      3    M
    rubble from all levels                  when dumping rubbish                2                 rumble to ground floor from levels above.                                                  9
                                            from heights.                       1                 o Chutes attached to the building or scaffold
584 Milton Road TOOWONG QLD 4066                           SWMS Developed by:       Jamie Gilbert                                                               VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                        Position:                National Health & Safety Co-ordinator                                                         Page 99
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.