SWMS 36 – Install Manufactured Roof Trusses (General)
Safe Work Methods
Responsible Residual
H Controls / Work Methods
Person/s for Risk
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer
Monitor & L C R
C 5. Admin 6. PPE
Review
Avoid carrying heavy or awkward loads up stairs or
lifting into position – use team lifting techniques as
required
Pushing is preferred to pulling, heavier items are to
be stored between hip and shoulder height wherever
practicable.
Overreaching by personnel to pick up a load is to be
avoided wherever practicable.
Operating & working from Falls B 4 E 1 No persons are to exit from the scissor lift at height EWP Operator E 4 H
EWP’s 21 unless a risk assessment is carried out and suitable 10
precautions are in place to ensure the safety of persons
4 in the scissor lift and structure.
Scissor lift platforms must be fitted with a gate.
1 No person is to climb on the EWP edge protection or
otherwise attempt to gain further height.
Falling Objects C 3 H 3 Establish an exclusion zone below the work area (e.g. EWP Operator D 3 M
13 barricade tape minimum 900mm high). 9
4 Toe boards, guardrails & midrails shall be in place.
3 Only tools, materials and equipment that can be safely
handled by a person working from the platform are to
1 be transported.
Do not support material on the handrail.
Roll-over C 5 E 2 The operating surface for solid tires scissors - is to be EWP Operator E 5 H
22 flat and level. 15
2 The operating surface for all terrain scissors - is to
reasonable level ground within manufacturers
1 specifications.
1 Do not operate on unstable / soft surfaces.
Ensure the SWL is not exceeded.
Stability of trusses Slips, trips and falls, A 5 E 4 All trusses shall be braced and stabilized throughout the Workers D 4 H
during installation structural collapse 25 installation process. involved with 14
5 the task
584 Milton Road TOOWONG QLD SWMS Developed by: Jamie Gilbert VERSION 3 – September 2015
4066 Position: National Health & Safety Co-ordinator Page 165
P: (07) 3335 5000 F: (07) 3335 5005
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.