                                                                  SWMS 36 – Install Manufactured Roof Trusses (General)
Safe Work Methods
                                                                                                                                                   Responsible       Residual
                                                                               H                      Controls / Work Methods
                                                                                                                                                   Person/s for        Risk
        Job Steps                     Potential Hazards       L     C   R      O           1. Eliminate 2. Substitute 3. Isolate 4. Engineer
                                                                                                                                                    Monitor &       L   C R
                                                                               C                           5. Admin 6. PPE
                                                                                                                                                     Review
                                                                                       Trusses shall not be loaded, including stood on, until
                                                                               4        temporary bracing is fixed in place in accordance with
                                                                                        structural drawings.
                                                                               4       The first truss should be erected straight and vertical
                                                                                        and temporary braced in position as per Appendix C of
                                                                                        AS 4440-2004 as appropriate. A copy of the standard
                                                                                        can be found on the intranet:
                                                                                          http://hbemp70/HutchIntranet/Default.aspx?classid=1
                                                                                          20
                                                                                       Each successive truss should then be spaced and fixed
                                                                                        back to the first truss with temporary ties to top and
                                                                                        bottom cord at a maximum spacing of 3000mm.
Accessing and working          Falls from height              B     5   E      4       A suitable means of access to areas at height is to be    Hutchinson        E    5       H
at height to install                                                    24              provided and used (e.g. appropriately placed / secured    Builders Site                  15
ancillary items (trimmers,                                                              ladder, stairs, EWP etc.                                  Foreman
nogging, framing                                                                       Workers are not to access any area(s) where edge
brackets and tie down)                                                         1        protection has not been erected or where any other fall   Workers
                                                                                        hazard may exist.
                                                                                       Under no circumstances are workers to climb on or
                                                                               1        otherwise position themselves where they are at risk of
                                                                                        falling onto and / or over protected edges.
                               Falling objects                C     4   E      4       Where there is a risk of objects falling onto workers /   Hutchinson        D    4       H
                                                                        18              persons below, a suitable means of restraining tools,     Builders Site                  14
                                                                                        equipment and any other materials is to be used (e.g.     Foreman
                                                                                        lanyards / wrist straps, toe boards (min 150mm high)
                                                                               3        etc.).                                                    Workers
                                                                               1       Exclusion zone(s) to be established below (where
                                                                                        relevant).
                                                                                       Tools, equipment and any other objects / materials are
                                                                                        not to be positioned where they could fall.




584 Milton Road TOOWONG QLD                               SWMS Developed by:       Jamie Gilbert                                                    VERSION 3 – September 2015
4066                                                      Position:                National Health & Safety Co-ordinator                                              Page 166
P: (07) 3335 5000 F: (07) 3335 5005
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.