Hutchinson Builders – ABN:52 009 778 330
WHSMP:01 – Work Health & Safety Management Plan
Version: 9.2
Maximum duration the
Form Number Permit Name Type of work or work environment requiring a permit
permit is valid
HB-HSEQ-F-074 Isolation & To be enforced for the This covers the servicing and maintenance of machines and equipment in
Lockout duration of the isolation. which the unexpected energizing, start-up of the machines or equipment,
Permit or release of stored energy could cause injury to employees. Energy
sources may include: electrical, mechanical, hydraulic, pneumatic,
chemical, nuclear, thermal or other energy.
HB-HSEQ-F-075 Confined For the duration of the task To be obtained for work occurring in an enclosed or partially enclosed
Space Permit on the day of application space that:
ONLY. - Is not designed or intended to be primarily occupied by a person
- E.g. vats, tanks, pits, pipes, ducts, flutes, chimney’s, silos, containers,
pressure vessels, underground sewers, wet or dry wells, shafts,
trenches, tunnels or other similar enclosed or partially enclosed
structures.
HB-HSEQ-F-076 Hot Works For the duration of the task - Flame (Welding / soldering / brazing)
Permit on the day of application - Spark or slag (grinding/ cutting/ friction tools /welding)
ONLY. - Hot Objects (metal surface / plate etc.)
- Other works
HB-HSEQ-F-077 Working at Flexibility to cover the - For all works over 2.0 meters from the ground – working on any of
Heights duration of the W@H the following:
Permit activity. Must be reviewed o Scaffold / mobile scaffold / EWP / scissor lift / ladder /
platform ladder
weekly.
HB-HSEQ-F-078 Excavation Flexibility to cover the - Bulk cut
Permit duration of the excavation - Drilling / piling
activity. Must be reviewed - Trenching
- Other
weekly.
HB-HSEQ-F-079 Coring / For the duration of the task - Cutting activities
Cutting on the day of application - Coring
Permit ONLY - Other
16. HIGH RISK WORK SYSTEMS
HB recognizes that there is a need for high risk work to be completed on construction projects. To meet this
requirement HB have developed SWMS for safe systems of work. Site specific SWMS are developed once
final scope and details of construction have been received. SWMS will be monitored through the completion
of Task Observations. Please refer to section 5.1.2 of this Plan for more information on SWMS requirements.
In the event of inclimate weather sites are to refer to the Bureau of Meteorology and/or relevant government
website in conjunction with Site Shut Down and Storm Preparation Checklist (HBHSEQ-F-084). In serious
weather conditions high risk work tasks should only be conducted following the completion of a relevant risk
assessment that deems the works safe to all stakeholders.
In addition to the above mentioned high risk work systems the following requirements shall also be met:
16.1 Demolition
All Demolition works shall only be undertaken by a licensed Demolition contractor in accordance with AS
2601 (The Demolition of Structures).
Demolition work includes any work to demolish, deconstruct or dismantle a structure, or part of a structure
that is load-bearing or otherwise related to the physical integrity of the structure. Demolition work involves
hazards for which potential exposure must be controlled, including:
falling objects, including part or all of a structure or debris
being struck or crushed by operating mobile plant
airborne contaminants, such as asbestos or silica.
Page 46 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.