Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 45, section 1. The text section number identifies this passage in the reader.

                                                                                    Hutchinson Builders – ABN:52 009 778 330

                                      WHSMP:01 – Work Health & Safety Management Plan
                                                                                                                  Version: 9.2



                Aluminium ladders must never be used while undertaking electrical work.
                Any works to be performed from ladders must be done so from a platform ladder.
                Ladders in use on mobile scaffolds will be attached to the mobile scaffold, not in the
                 permanent structure.
                Is no longer than;
                   o 6 meters for a single ladder,
                   o Extension ladder for electrical work as defined in the Electrical Act 2002 – 9.2 meters or;
                An extension ladder 7.5 meters.

      15.4 Excavation & Penetrations
Excavations must be carried out in accordance with the SWMS to ensure a safe and efficient standard for
work is followed. Excavation includes, but is not limited to, breaking into:
                 Ground                                                Tunnelling
                 Trenching                                             Vertical Earth Cuts
                 Bulk earth excavation
Before any excavation work is carried out an Excavation Permit (HB-HSEQ-F-078) must be completed and
signed off by the person(s) requesting the permit, Site Manager/Foreman or person(s) in control of the
excavation.
                Any opening or excavation exposed in the ground, wall or structure that could cause an accident
                 by person(s)/equipment falling in/through should be roped off or barricaded as soon as
                 practicable. The barrier must be maintained until the opening/excavation is closed off or
                 backfilled.
                If the opening / excavation for ground excavations only have to be left open during the hours
                 of darkness the area should be clearly identified with the use of yellow flashing light.
                Any unusual or unexpected conditions, such as underground power lines, pipes or sewers must
                 be reported immediately.

      15.5 Coring / Drilling
Coring or drilling work must be carried out in accordance with the relevant SWMS and includes any coring /
cutting work where the worker will be breaking into:

                 Walls                                                 Ceilings
                 tilt – up panels                                      Ground
                 Soffit

Before any excavation work is carried out a Coring / Cutting Permit (HB-HSEQ-F-079) must be completed
and signed off by the person(s) requesting the permit, Site Manager/Foreman or person(s) in control of the
excavation.




                                                                                                                Page 45 of 58

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.