Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 460, section 1. The text section number identifies this passage in the reader.

                                                                                                                                      Project Roles and Responsibilities
                                                                                                                                                                          HB-HSEQ-F-007
                                                                                                                                                                             Version: 10




    Title               Start of Project                      Daily                             Weekly                          Monthly                        Periodically
Team Leader   - Total responsibility for         - Be available to resolve any      - Take an active role in         - Review fortnightly H&S         - Ensure that a review of the
                Health & Safety for the            HSEQ issues as raised by           ensuring Health & Safety and     reports from site.               WHSMP & PRA occur every 3
                project                            team members.                      Environment protection for                                        months.
                                                                                                                     - Report on project
              - Ensure development of            - Refer to Team Leaders              the project.                                                    - Participate in site WH&S
                                                                                                                       performance at the budget
                WHSMP, EMP, QMP and                Responsibilities HB-HSEQ-F-      - Ensure that the                                                   Committee meetings.
                                                                                                                       meetings HB-HSEQ-F-049
                other plans as applicable          007-A.                             administration requirements                                     - Carry out performance
                                                                                                                       Project Performance.
                together with Project                                                 for the project are being                                         reviews with project staff as
                                                                                      actioned.                      - Ensure project roles and
                Manager, Site Manager,                                                                                                                  required.
                                                                                    - Take an active role in the       responsibilities are
                Contracts Administrator and
                                                                                      quality management               implemented.
                HSE Officer.
              - Review and sign the                                                   including budget, timeframe    - Participate in Monthly HSE
                completed:                                                            and product quality.             Review Meeting (as
                    - WHS Management Plan &                                                                            required).
                    - Project Risk Assessment.
              - Ensure Project Team is aware
                of allocated roles and
                responsibilities for the
                project.
Project       Site Actions:                      - Be available to resolve health   - Take an active role in         - Conduct site inspection then   - Ensure OHS Purchase
Manager                                            and safety issues as raised by     ensuring Health & Safety for     - attend and coordinate OHS      Checklist are actioned when
              - Assist in the development of
                 the Project Management            team members.                      the project with the site        Monthly Review Meeting           plant is purchased for site
                 Plan including all associated   - Refer to Project Managers          team.                            Agenda & performance             Refer: OHS Procedure MP:11
                 management plans                  Responsibilities HB-HSEQ-F-      - Conduct a walk-through of        registers Refer to: OHS          and HB-HSEQ-F-024
              - Review and sign the                007-B.                             the site.                        Procedure MP:05 and HB-        - Participate in site WHS
                 completed                       - Approve Invoices.                - Plan for the week ahead and      HSEQ-F-049                       Committee meetings.
                                                 - Ensure completion of Roles         ensure H&S impacts are         - Participate in monthly walk    - Ensure reviews of the project
                -     WHSMP, EMP & QMP
                                                   and responsibilities by all        considered and actions           through with the Team            specific management plans
                -     Project Risk Assessment      project members                    determined.                      Leader                           and Project Risk Assessments
                -     Responsibility Statement   - Monitor resources and            - Monitor outstanding            - Ensure site team Objective &     every 3 months.
              - Ensure Roles and                   allocate appropriately.            Corrective Action Reports        Targets are met on site.       - Carry out performance
                Responsibilities are                                                  (CARs).                          Refer to: WHSMP - Appendix       reviews with project staff as
                appropriately assigned and                                          - Review project weekly health     5 and OHS Procedure MP:01        required.
                all project team members are                                          and safety reports and
                aware of their roles and                                              incidents and investigations
                responsibilities.                                                     that have occurred.
              Note:

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.