Skip to the record
Accept no imitations.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 475, section 1. The text section number identifies this passage in the reader.

                                Responsibility Statement – Project Quality Representative
                                                                                               HB-HSEQ-F-007-K
                                                                                                     Version: 1




Name:           Matt Leeke

The responsibilities of Project Quality Representative (PQR) for Quality management within Hutchinson
Builders include, but are not limited to, HB-HSEQ-F-007 and the following:


       The PQR has the authority and responsibility for ensuring that the requirements of the
        management plan are implemented and that processes are carried out and verified according to
        project documentation. The PQR operates independently of other project activities.
       Report nonconformities to the Project Manager.
       Arrange for testing and survey services from providers.
       Notify the project team of impending hold points and witness points.
       Report on the effectiveness of procedures and control measures to the Site Manager.
       Assist the Site Manager in carrying out inspections.
       Control the movement and storage of records.
       Ensure that project records are created (that is, checklists are completed and signed off; forms are
        filled-in with complete and accurate data).
       Ensure that records are filed such that they can be easily retrieved when required.
       Protect records from loss, damage, tampering and corruption.
       Respond to the client’s requests for records and the client’s record-keeping requirements.
       Ensure that identified records are delivered to the client at the times set out in the contract
        documents.
       Ensure all service providers are approved for use on the project and are able to provide services
        complying with Hutchinson Builders expectations.


As a Hutchinson Builders – Project Quality representative, I agree to adhere to the Health, Safety,
Environment and Quality procedures as outlined in Hutchinson Builders’ Management Systems, and I
acknowledge receipt of and understand the aforementioned responsibilities.




                   Signature:


                      Dated:

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.