Register of Project Performance Measures
HB-HSEQ-F-050
Version: 12
KPI Results for the
Financial Year Overall
Management Objective Key Performance Indicators Target Responsibility
Result
Q1 Q2 Q3 Q4
Contain sediment and contaminated No recorded failures of sediment Project site team members
water on site control devises or discharge of
contaminated water
No unintentional removal of trees No removal of unmarked trees Project site team members
from site
No native fauna injured as a result of Zero harm to native animals Project site team
activities on site
Number of enforcement actions Zero enforcement actions. Project site team members
taken for breaches of legislative
requirements.
No unintentional release of sewerage No overflow of sewerage onto Project site team members
from site adjoining public areas
8. To provide a quality product that Percentage of the latest contract 100% of the latest contract Contract Administrator Site
meets client, regulator and drawings transmitted to site and drawings received on site Manager/ Foreman
Hutchinson Builders’ expectations on recorded on Drawing Register
time and on budget. Percentage of Concrete deliveries are 100% concrete delivery dockets Contract Administrator Site
traceable and identified can be identified and trace to the Manager/foreman
concrete register
Actions of recorded major non- Quality C.A.R.s closed out Site Manager/foreman
conformance for quality 75% within 7 days Contract Administrator
improvements closed out 100% within 14 days
Percentage of Actions from 100% Inspection and Test Plans Site Manager/foreman
Inspection & Test Plans closed out are closed out to meet Contract Administrator
requirements
Actions of recording product Daily inspections by engineers, Site Manager/foreman
inspections and minor quality inspectors and minor rectification Contract Administrator
improvements undertaken are work to be recorded on the
recorded Foreman’s Daily Diary
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.