Council archive · source document
Whsmp · OPW16/0021
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 497, section 1. The text section number identifies this passage in the reader.
WHS Management Plan – Appendix 6
Version 9.1
APPENDIX 6
HIGH RISK WORK ACTIVITY CHECKLISTS
- Formwork & Concrete Placement Installation Checklist
- Monthly Scaffold Inspection Checklist
- Construct and Erect Tilt-Up Concrete Panels
- Removal of Asbestos Materials
- Erection of Pre-Cast Wall and Column Panels
- Demolition of Work Structures
- Erecting Structural Steel
- Tower Crane Selection and Positioning
- Erection of a Tower Crane
- Tie Installation and Climbing of a Tower Crane
- Dismantle of a Tower Crane
- Suspended Scaffold – Swing Stage Placement, Erection and Dismantling
- Removal of Lead Materials
HIGH RISK WORK PERMITS
- Confined Space Permit
- Hot Work Permit
- Work at Heights Permit
- Isolation and Lock Out Permit
- Excavation and Penetration Permit
PROJECT FORMS
- Weekly HSE Inspection Checklist
- Site Weekly Data Collection Form
- First Aid Checklist
- Critical Response Checklist
- Incident / Accident / Hazard Report Form
- Corrective Action Report (C.A.R.)
- HSE Induction Training Record Form
- Hazardous Substance Risk Assessment
- Hazardous Substances / Dangerous Goods Training Record
- Generic Pre-start checklist
- Record of Toolbox Talk Form
- Daily Prestart
- Task Observation Form
- Subcontractor SWMS Checklist
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.