Removal of Asbestos Material Checklist
HB-HSEQ-F-063
Version: 3
WORK ACTIVITY: REMOVAL OF ASBESTOS MATERIALS - Safety Checklist page 1
Qualifications / Competencies: Hold an Asbestos A class certificate, hold a B class certificate, holders of a prescribed activity certificate
Signed By:
Item No. TASK DESCRIPTION ACCEPTED CRITERIA Checked - BUILDER COMP/PERSON
√
1 Are the owner / principal legally • Has the project be granted DA & BA approval for the work to
empowered to carry out the work? proceed.
• Authorisation from the owner / principal to proceed with the work.
2 Investigation of the age of the Possibly contain asbestos in some form if approvals were given;
building. • A building built before or in 1979.
• A building started in 1979 but completed in 1980.
• A building built in the 1980,s under an approval given in 1979.
• A building or part of a building where approval given after 1979 but
before 1990.
3 Investigate if there is asbestos within Before work starts;
the building. • Owner has provided an Asbestos report and register of identified
asbestos materials.
• A qualified person needs to be engaged to prepare an Asbestos
Report and to provide a register of identified asbestos materials.
• Treating all materials contained within the building as containing
asbestos;
Asbestos product
Asbestos containing material (ACM).
4 Removal of Asbestos Product; • A competent person (holder of a B class certificate) to carry out the
• Cement products work; refer to Code of Practice – How to safely Remove Asbestos
• Galbestos 2011.
• Friction products • The Competent person removing the ACM is to notify the relevant
• Floor tiles regulatory body 5 days prior to the removal the ACM on approved
forms.
5 Removal of Asbestos Material; Of any quantity of material;
• Thermal insulation • Holder of a Certificate to work as an “Asbestos Removalist” is to visit
• Acoustic insulation the proposed removal area, assess and prepare a SWMS in
• Asbestos backing on floor accordance with the Code of Practice – How to safely Remove
Asbestos 2011.
Page 1 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.