                                                                                                                                            Removal of Asbestos Material Checklist
                                                                                                                                                                                HB-HSEQ-F-063
                                                                                                                                                                                    Version: 3



WORK ACTIVITY: REMOVAL OF ASBESTOS MATERIALS - Safety Checklist                                                                                       page 1
Qualifications / Competencies: Hold an Asbestos A class certificate, hold a B class certificate, holders of a prescribed activity certificate
                                                                                                                                                               Signed By:
 Item No.              TASK DESCRIPTION                                            ACCEPTED CRITERIA                                   Checked -   BUILDER              COMP/PERSON
                                                                                                                                          √
     1        Are the owner / principal legally         •   Has the project be granted DA & BA approval for the work to
              empowered to carry out the work?              proceed.
                                                        • Authorisation from the owner / principal to proceed with the work.
     2        Investigation of the age of the           Possibly contain asbestos in some form if approvals were given;
              building.                                 • A building built before or in 1979.
                                                        • A building started in 1979 but completed in 1980.
                                                        • A building built in the 1980,s under an approval given in 1979.
                                                        • A building or part of a building where approval given after 1979 but
                                                            before 1990.
     3        Investigate if there is asbestos within   Before work starts;
              the building.                             • Owner has provided an Asbestos report and register of identified
                                                            asbestos materials.
                                                        • A qualified person needs to be engaged to prepare an Asbestos
                                                            Report and to provide a register of identified asbestos materials.
                                                        • Treating all materials contained within the building as containing
                                                            asbestos;
                                                             Asbestos product
                                                             Asbestos containing material (ACM).
     4        Removal of Asbestos Product;              • A competent person (holder of a B class certificate) to carry out the
                 • Cement products                          work; refer to Code of Practice – How to safely Remove Asbestos
                 • Galbestos                                2011.
                 • Friction products                    • The Competent person removing the ACM is to notify the relevant
                 • Floor tiles                              regulatory body 5 days prior to the removal the ACM on approved
                                                            forms.
     5        Removal of Asbestos Material;             Of any quantity of material;
                 • Thermal insulation                   • Holder of a Certificate to work as an “Asbestos Removalist” is to visit
                 • Acoustic insulation                      the proposed removal area, assess and prepare a SWMS in
                 • Asbestos backing on floor                accordance with the Code of Practice – How to safely Remove
                                                            Asbestos 2011.



                                                                                                                                                                                  Page 1 of 2

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.