                                                                                                            Construct & Erect Tilt-Up Concrete Panels Safety Checklist
                                                                                                                                                              HB-HSEQ-F-062
                                                                                                                                                                  Version: 4




Qualifications / Competencies: Experienced qualified tradesman, trained person, qualified engineer licensed rigger and crane operator
                                                                                                                              Signed By:
                                                                                                                                  Checked
Item No.              TASK DESCRIPTION                                          ACCEPTED CRITERIA                                           BUILDER   COMP/PERSON
                                                                                                                                    -√
    7        Braces installed to panels and deadmen.    •   Braces to have ID plates fitted and to be good condition.
                                                        •   Braces installed in accordance with engineer’s details and bracing
                                                            layout plan.
                                                        •   Adequately secured the braces to panel inserts and deadmen
                                                            with the correct tension.
                                                        •   Manufacturer requirements complied with for securing drill in
                                                            type anchors.
                                                        •   Protect braces from plant operations and movements – review
                                                            erection of barricades
                                                        •   Anchor shaft is correct size to suite slot in brace foot and washer
                                                            is 40mm dia to bare on foot.
    8        Release of temporary bracing from          •   Installed Structural Steel to be certified by an engineer before
             erected panels.                                bracing is removed
                                                        •   Any supporting structure must be adequately braced.
    9        Environmental issue affecting safe panel   •   Not to lift in rain or rain affected ground areas that could cause
             erection.                                      the crane or workers to slip or slide.
                                                        •   Not to lift in wind conditions that could cause the crane and panel
                                                            to become unstable.
    10       On Site Welding.                           •   The qualified welder / boiler maker shall provide a sign off
                                                            procedure verifying that the welds carried out meets the
                                                            requirements of the engineers drawing and relevant GP AS 1554
                                                            .1 standard.

The following persons confirm that the above Checklist has been implemented:

PROJECT __________________________________________________________________________________________________

Foreman:        __________________________                  Competent Person:          ____________________________________ Date:______________

Signature:      __________________________                  Signature:                 ____________________________________ Date: ______________

                                                                                                                                                                Page 2 of 2

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.