                                                                                                    Erection of Pre-Cast Wall & Column Panels Checklist
                                                                                                                                                        HB-HSEQ-F-064
                                                                                                                                                            Version: 2




Qualifications / Competencies: Qualified engineer, experienced / trained workers, licensed dogman / rigger and crane operator
                                                                                                                          Signed By:
Item No.           TASK DESCRIPTION                                  ACCEPTED CRITERIA                                Checked          BUILDER   COMP/PERSON
                                                                                                                         √
   4       Rigging and lifting of panels from      Rigging plan for panels and columns given to the crane
           loading zone.                            operator and dogman / rigger prior to lift – tool box talk
                                                    undertaken.
                                                   Panels and columns are checked off before the dogman /
                                                    rigger starts to rig up.
                                                   Communication and an understanding between traffic
                                                    controller and dogman / rigger during lifting sequence – tool
                                                    box talk undertaken.
                                                   End and face lifters are compatible with the lifting inserts in
                                                    panels delivered.
                                                   Rigging equipment checked by licensed dogman / rigger.
                                                   Communications checked between crane operator and the
                                                    dogmen/ riggers involved in the lift.
                                                   Exclusion zones and processes have been action and in place
                                                    to protect adjoining public areas.
   5       Lifting Panels into Position.           Workers involved in the placing of panels and columns have
                                                    been given a tool box talk in the safe work practices.
                                                   Workers working on the adjacent areas have been advised of
                                                    lifting procedures i.e.;
                                                     Crane horn will discharge twice before moving over live
                                                          deck areas.
                                                     Workers are to look up and be aware of the travel path
                                                          of panel.

                                                   Panel to be under the control of the dogman / rigger at all
                                                    times until the panel is placed.




                                                                                                                                                             Page 2 of 3

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.