Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 510, section 1. The text section number identifies this passage in the reader.

                                                                                                                                 Demolition Work of Structures
                                                                                                                                                          HB-HSEQ-F-066
                                                                                                                                                              Version: 3




Qualifications / Competencies: Hold a demolition certificate, experienced / trained workers and licensed holders
                                                                                                       Signed By:
Item                                                                                                          Checked
               TASK DESCRIPTION                                  ACCEPTED CRITERIA                                                 BUILDER       COMPETENT PERSON
 No.                                                                                                              √
  5      Protection of adjoining Public         Assess demolition impact on the structural integrity of adjoining buildings
         property and areas.                     or structures.
                                                Identify safe passage of access and egress to adjoining public buildings and
                                                 areas.
  7      Methods of Demolition.
                                                Sequence of demolition required.

                                                Determine safe access and egress during activities.

                                                Determine loads on floors and walls.
                                                Determine demolition processes for activities;
                                                 o Manual demolition above ground level
                                                 o Mechanical demolition at ground level
                                                 o Mechanical demolition above ground level
                                                 o General induced collapse methods
                                                 o Felling by direct pushing or pulling with chains
                                                 o Collapse induced by explosives
                                                Determine storage and method of removal of materials

                                                Determine the plant and equipment to be used
  8      Work plan.
                                                Demolition plan and safe work methods in place
                                                Methodology to bring the structure down

The following persons confirm that the above Checklist has been implemented:

PROJECT __________________________________________________________________________________________________

Foreman:                 _________________________          Signature:                    ____________________________________ Date:______________

Competent Person:        __________________________         Signature:                    ____________________________________ Date: ______________

HSO:                     __________________________         Signature:                    ____________________________________ Date: ______________



                                                                                                                                                               Page 2 of 2

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.