Skip to the record
Beware of cheap imitations.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 511, section 1. The text section number identifies this passage in the reader.

                                                                                                                                              Erecting Structural Steel
                                                                                                                                                                  HB-HSEQ-F-067
                                                                                                                                                                      Version: 3


Qualifications / Competencies: Licensed Riggers and doggers, experienced / trained workers, licensed holders of Prescribed Occupations
                                                                                                                                                   Signed by:
 Item                                                                                                                     Checked
                    TASK DESCRIPTION                                       ACCEPTED CRITERIA                                             BUILDER           LICD/RIGGER
  No.                                                                                                                       -√
   1     Planning and Design                        Consultation between the design engineer, fabricator, site
                                                    foreman and the steel erector has taken place regarding;
                                                          Access to work areas where erection is to take place
                                                          Location of other trades relative to the erection area
                                                          Restricted areas and the need for barricades
                                                          Safe erection in assembled portions and single
                                                              sequential lifting techniques
                                                          Ground conditions for crane set up
                                                          Engineers certification where crane is to be positioned,
                                                              where mobile scissor lifts, boom lifts and other plant is
                                                              to carry out movements on suspended concrete floors
                                                     • Design loads on cantilevered awnings during construction
                                                         activities
  2      Fabricators                                • Engineer’s portal structural steel drawings have been issued
                                                        to the qualified / competent fabricator to produce shop
                                                        DWG’s for fabrication signed off by an engineer
                                                    • Fabricator has consulted the steel erector to;
                                                         Sequence of delivery of each stage
                                                         Components marked for ease of erection
                                                         Loading of components on truck so that components can
                                                             be lifted and unloaded safely without uncontrolled
                                                             movements
                                                         Weight of steel members to be in capacity of the radius
                                                             of the crane used on site
                                                         Use of Riggers poll on beam sections

                                                    •   Fabricated components have be checked by qualified person
                                                        before leaving yard




                                                                                                                                                                         Page 1 of 2

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.