Skip to the record
The gold standard in government transparency.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 514, section 1. The text section number identifies this passage in the reader.

                                                                                                                                      Tower Crane Selection & Positioning
                                                                                                                                                                 HB-HSEQ-F-068
                                                                                                                                                                     Version: 3


ITEM                                                                                                                     Checked - √
            TASK DESCRIPTION                                     ACCEPTED CRITERIA                                                                   COMMENTS
 NO.                                                                                                               YES      NO       N/A
        • Loading Areas                •    Underground services present that limit the location of the crane
                                            base
                                       •    Air space issues - neighbouring properties
                                            - Loads encroaching neighbouring properties
                                            - Crane Jib encroaching when weather veining
                                            - Other cranes on adjacent sites
                                            - Height effecting flight path near airports
                                       •    Zoning and anti-collision devices and requirements
                                       •    Unauthorised access to the crane – trap doors and hoarding
                                       •    Check Loading areas – truck access, traffic control requirements,
                                            accessing trucks (work at heights)
 4     Erecting, Climbing and          •    Mobile crane set up areas
       Dismantling issues:                  - underground services,
                                            - traffic control issues,
        •   Exclusion zones                 - jib laydown areas
        •   Climbing schedule          •    Erection Times – traffic permits may require crane erection at night
        •   Crane ties                 •    Exclusion Zones – Best Policy to close the site to other trades when
        •   Mobile crane                   erecting and dismantling
        •   Temporary storage          •    Crane Ties – Engineers Requirements- building modifications to
                                           accept the structure- Building Program synchronised (Jump Forms
                                           etc.)
                                       •    Climbing Requirements:
                                            - Schedule synchronised with the building program (Jump Forms
                                                 etc.)
                                            - Exclusion Zones when Climbing – 12 metres around the crane
                                            - Storage areas for Tower Sections – External Crane
                                       •    Sufficient space available on the ground for dismantling of tower
                                             crane sections when the building is nearing completion
 5     Lifting and work area issues:   •    Complete a Site Lift Study – identify load exclusion zones, Travel
        • Load Travel Paths                 Paths, Load Sizes, Loading bays, storage areas.
        • Loading bays                 •    Location and quantity of loading bays identified
        • Site sheds                   •    Site sheds require protection if in slewing path
        • Power lines                  •    Overhead power lines in the vicinity
        • Loading zones                •    Delivery loading zones adequate for project


                                                                                                                                                                   Page 2 of 3

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.