Tower Crane Selection & Positioning
HB-HSEQ-F-068
Version: 3
ITEM Checked - √
TASK DESCRIPTION ACCEPTED CRITERIA COMMENTS
NO. YES NO N/A
• Loading Areas • Underground services present that limit the location of the crane
base
• Air space issues - neighbouring properties
- Loads encroaching neighbouring properties
- Crane Jib encroaching when weather veining
- Other cranes on adjacent sites
- Height effecting flight path near airports
• Zoning and anti-collision devices and requirements
• Unauthorised access to the crane – trap doors and hoarding
• Check Loading areas – truck access, traffic control requirements,
accessing trucks (work at heights)
4 Erecting, Climbing and • Mobile crane set up areas
Dismantling issues: - underground services,
- traffic control issues,
• Exclusion zones - jib laydown areas
• Climbing schedule • Erection Times – traffic permits may require crane erection at night
• Crane ties • Exclusion Zones – Best Policy to close the site to other trades when
• Mobile crane erecting and dismantling
• Temporary storage • Crane Ties – Engineers Requirements- building modifications to
accept the structure- Building Program synchronised (Jump Forms
etc.)
• Climbing Requirements:
- Schedule synchronised with the building program (Jump Forms
etc.)
- Exclusion Zones when Climbing – 12 metres around the crane
- Storage areas for Tower Sections – External Crane
• Sufficient space available on the ground for dismantling of tower
crane sections when the building is nearing completion
5 Lifting and work area issues: • Complete a Site Lift Study – identify load exclusion zones, Travel
• Load Travel Paths Paths, Load Sizes, Loading bays, storage areas.
• Loading bays • Location and quantity of loading bays identified
• Site sheds • Site sheds require protection if in slewing path
• Power lines • Overhead power lines in the vicinity
• Loading zones • Delivery loading zones adequate for project
Page 2 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.