Tower Crane Selection & Positioning
HB-HSEQ-F-068
Version: 3
ITEM Checked - √
TASK DESCRIPTION ACCEPTED CRITERIA COMMENTS
NO. YES NO N/A
• Control radius & loads • Crane Planning – Crane boards (who is managing the crane board
and the crane crew)
6 Multiple cranes & other • Multiple cranes to operate on site
plant: • Satellite Type concrete boom to be used –
- Sharing loading areas when pumping
• On site - Radio communications between crews
• Concrete pumps • Mobile Type Pumps
• Mobile cranes - Sharing loading areas when set up and pumping
- Communications Between Crews
• Mobile cranes to be utilised with the tower crane operating
7 Environmental factors: • Minimal effect on adjoining business and residences and workers.
Inadvertent leakage of hydraulic oils and fuels will not affect
• Noise adjoining environments
• Substance clean up
The following persons confirm that the above Checklist has been implemented:
Project Manager: __________________________ Foreman: _______________________________ Crane Supplier: __________________
Signature: __________________________ Signature: _______________________________ Signature: _____________________
Page 3 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.