Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 515, section 1. The text section number identifies this passage in the reader.

                                                                                                                                 Tower Crane Selection & Positioning
                                                                                                                                                               HB-HSEQ-F-068
                                                                                                                                                                   Version: 3


ITEM                                                                                                              Checked - √
             TASK DESCRIPTION                                 ACCEPTED CRITERIA                                                                     COMMENTS
 NO.                                                                                                        YES      NO       N/A
        • Control radius & loads     •   Crane Planning – Crane boards (who is managing the crane board
                                         and the crane crew)
 6     Multiple cranes & other       •   Multiple cranes to operate on site
       plant:                        •   Satellite Type concrete boom to be used –
                                         - Sharing loading areas when pumping
        • On site                        - Radio communications between crews
        • Concrete pumps             •   Mobile Type Pumps
        • Mobile cranes                  - Sharing loading areas when set up and pumping
                                         - Communications Between Crews
                                     •   Mobile cranes to be utilised with the tower crane operating
 7     Environmental factors:        •   Minimal effect on adjoining business and residences and workers.
                                         Inadvertent leakage of hydraulic oils and fuels will not affect
        • Noise                          adjoining environments
        • Substance clean up

The following persons confirm that the above Checklist has been implemented:


Project Manager: __________________________      Foreman:         _______________________________                   Crane Supplier:   __________________


Signature:       __________________________      Signature:       _______________________________                   Signature:        _____________________




                                                                                                                                                                 Page 3 of 3

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.