Council archive · source document
Whsmp · OPW16/0021
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 520, section 1. The text section number identifies this passage in the reader.
Dismantle of a Tower Crane Checklist
HB-HSEQ-F-069-C
Version:1
PROJECT: DATE:
ITEM NO TASK DESCRIPTION ACCEPTED CRITERIA CHECKED COMMENTS
• On completion checks:
- Road way and foot path clear of debris (if packing under crane
pads with sand)
- Traffic control signs removed
The following persons confirm that the above Checklist has been implemented:
HB Foreman: __________________________ Site Safety Advisor: _______________________________ Crane Supplier: ________________________
Signature: __________________________ Signature: _______________________________ Signature: ________________________
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.