                                                                                                                      Dismantle of a Tower Crane Checklist
                                                                                                                                                   HB-HSEQ-F-069-C
                                                                                                                                                         Version:1



PROJECT:                                                                                                    DATE:
ITEM NO      TASK DESCRIPTION                                 ACCEPTED CRITERIA                             CHECKED               COMMENTS
   1       Planning             •   Lift Plan conducted for the crane dismantle including:
                                         - Dismantle crane size,
                                         - Crane location,
                                         - Crane configuration and
                                         - Laydown areas.
                                •   Traffic Management Plan completed (who is responsible for it)
                                •   Permits Received.
                                •   SWMS Submitted for dismantle of the crane and climbing down (if
                                    required), using mobile cranes including dual crane lifts.
                                         - Harness register included in SWMS.
                                •   Dismantle Crew Identified and Competencies confirmed.
                                         - Dismantle Supervisor
                                         - Electrician/ Diesel Fitter
                                         - Riggers
                                         - Crane Operators
                                •   Contacted Relevant Stakeholders in advance of Dismantle i.e.
                                         - Neighbouring Properties
                                         - Unions
                                         - Site Safety Committee
                                         - Relevant Supervisors and Subcontractors
                                •   Plant packs received for all dismantle cranes and other equipment
                                    (including maintenance registers).
                                •   Confirmed induction requirements for all dismantle crew.
                                •   Confirmed start times for workers onsite.
   2       Dismantle Day        •   All dismantle crew inducted to site
                                •   Traffic control set up as per Traffic Management Plan
                                •   Exclusion Zones have been set up and are suitable.
                                •   Dismantle crew have signed into SWMS and signed version given to Site
                                    Safety Advisor
                                •   Mobile cranes are set up as per the Lifting Plan
                                •   Works are completed as per the sequence in the SWMS
                                •   Works don’t exceed Traffic Permit



                                                                                                                                              Page 1 of 2

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.