Hutchinson Builders – ABN:52 009 778 330
WHSMP:01 – Work Health & Safety Management Plan
Version: 9.2
Plant & equipment will comply with HB Selection & Purchasing of Plant, Goods and Services (MP:11) and:
Be registered if operating on gazetted public roads.
Licensed if operating on gazetted public roads.
Be mechanically safe in good working order, and approved for site use.
Contain a current “Daily Inspection” log that may at any time be inspected by a client
representative.
Shall have the appropriate log books and comply with all statutory requirements before being
sent to site. The approved provider will be requested to ensure full compliance covering such
aspects as noise, machine guarding, emergency stop switches, RCD protection, colour coding
of equipment and general conditions with relation to hazards.
17.2 Pre Start Checks
At the commencement of each shift all operators of plant, equipment and vehicles:
Must complete a plant specific pre-start check appropriate to that plant or equipment.
Must immediately place a red HB Plant sticker on any plant or equipment found to be defective.
The sticker is to be placed in a visible spot, identifying that the plant has not been accepted for
use on the project. The plant will be removed from site, or if it is to be fixed onsite, the plant is
to be isolated in accordance with Isolation & Lock Out Procedure (SP:03), will be applied prior
to any service or maintenance.
Defects that occur during the shift must be reported immediately to the Site Manager. The plant or
equipment shall be isolated (in accordance with Isolation & Lock-out Procedure (SP:03) and shall not be
operated until declared safe for use by a competent person (fitter/mechanic).
The Site Supervisor is responsible for the consultation process between the operator reporting the defect
and the competent person.
17.3 Elevated Work Platforms
All persons required to use a EWP must be:
Trained, assessed and deemed competent to operate the machine.
Be inducted and comply with SWMS.
Hold a national high risk work license for EWP greater than 11 metres.
Factors to be considered when using a EWP are:
The supporting surface has enough load bearing capacity for the EWP
The incline should not exceed the manufacturer’s recommendations
The outriggers where equipped should be fully extended with the pads bearing evenly
A standby person shall be present and competent to override controls if necessary
Persons must remain in the basket at all times
A safety harness must be worn and attached to an approved anchorage point 100% hook up
at all times except in scissor lifts.
17.4 Lasers
Page 53 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.