                                                                                     Hutchinson Builders – ABN:52 009 778 330

                                     WHSMP:01 – Work Health & Safety Management Plan
                                                                                                                   Version: 9.2



If a laser is being used, ensure that warning signs are displayed and other site personnel are warned not to
look directly into the beam of the laser. Set up laser well below or above normal eye level and ensure that
they are operated by trained personnel. Lasers should comply with AS 2211 Safety of Laser Products. A
Radiator/ Laser Safety Advisor will be appointed for the site in certain circumstances.

      17.5 Plant Using Compressed Air
Compressed air is used for air-driven tools or equipment. This air must be used with caution as misuse as
outlined below, can cause serious injury and possibly death. The following precautions will be taken at all
times;

             Never direct the stream of compressed air towards your body or towards anyone else.
             Never use compressed air to blow dust from objects or any part of your body.
             Never use water hoses as air-line hoses.
             Never indulge in horseplay with compressed air.
             Hoses, connections and securing clamps shall be checked to ensure they are not damaged,
              before putting any pressure in the line and ensure they are suitable for using compressed air.
             Lines shall be bled before disconnecting the equipment or air hoses.
             Ensure all joints in air hoses and lines are tight. Safety clips must be used on all quick release
              couplings (Chicago type) and safety chains/hose whips secured to the bull hose lines with the
              larger diameter.
             Air receivers are required to be inspected and have a current inspection certificate, which
              must be displayed prominently. Frequency of inspections corresponds with the expiry date of
              the certificate.

      17.6 Explosive Plant & Gas & Power Actuated Tools
Explosive plant/tools including Ramset and Hilti fastening tools shall be tested in accordance with the
manufacturer’s recommendations. As described in the Risk Management section of the WHSMP a SWMS will
be reviewed on site prior to the task commencing. All tools will be compliant with the relevant Australian
Standards.

      17.7 Lifting Equipment
All lifting equipment and Height Safety equipment shall be registered before being brought into use. Both
lifting equipment and height safety equipment shall be checked by trained competent persons and recorded
on the relevant registers (Lifting Gear Register - HB-HSEQ-F-038 or Height Safety Gear Register - HB-HSEQ-
F-039) before being placed into service. All lifting equipment is to be tagged and tested on a 3 month basis
in accordance with the state legislation requirements. Only trained competent persons shall use Height
Safety equipment.
High risk lifting activities requiring the crane contractor to provide lift plans include:
1.   Erection / Dismantle of Tower Cranes                 7. Lifting Large Pressure Vessels or tanks
2.   Lifting panels                                       8. Mobile Crane bigger than 100 Ton
3.   Dual Crane Lift                                      9. When exceeding 90% of the cranes Chart (WLL)
4.   Working Near Power lines                             10. Lifts over 15 ton
5.   Using a dogbox                                       11. Lifts near Trenches
6.   Lifting Bridge Beams



                                                                                                                 Page 54 of 58

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.