Hutchinson Builders – ABN:52 009 778 330
WHSMP:01 – Work Health & Safety Management Plan
Version: 9.2
Lifting will be in accordance with the lift plan and under direction of the relevant person stipulated in the
plan. If issues arise during the lift, the load will be secured safely and a solution will be identified by the team.
17.8 Loading Platform Procedure
The following procedures/controls must be complied with for the installation/removal of loading platforms
on HB sites:
Loading bays are to be designed into the scaffold design drawings and must be verified by a qualified
engineer
The installation/removal of loading platforms must be covered by a site specific SWMS
Persons undertaking the activity of installing/removing loading platforms must have completed a
competency course conducted by the supplier (i.e. Prestons)
Only persons with a basic riggers ticket/intermediate scaffold ticket who have been VOC assessed as
competent are to install/remove loading platforms
The above qualified person must complete a Loading Platform Installation Checklist each time a
platform is installed
A nominated competent person is to complete a Loading Platform Daily Check Sheet for each loading
platform installed on site.
Page 55 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.