Council archive · source document
Whsmp · OPW16/0021
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 553, section 1. The text section number identifies this passage in the reader.
Generic Initial Inspection Checklist
HB-HSEQ-F-033
Version: 2
Project: Date:
Plant Operator: Current Metre Hours:
Mobile Number: Service frequency:
Licence Type: Last Service Date / Hours:
Licence Number: Next Service Date / Hours:
Required Licence: Plant Make:
Plant Registration No.: Plant Model:
HAZARDS TYPE HAZARDS TYPE HAZARDS TYPE HAZARDS TYPE
Struck by moving Ergonomic problems
Entanglement from Shearing of two
and unexpected due to bad seating,
moving parts parts of plant items
plant movements plant controls
Electric shock and Slip trip or fall form
Failure of emergency Exposure to plant
burns due to poor wet surfaces or lack
stop button noise
maintenance of hand rails
Explosion by plant
Crush by plant Exposure to high and Unsafe plant
operation dust, gas,
movements low temperatures operations
vapours, liquids
Cuts, stabbed by Exposed to High
Friction from moving Suffocation due to
projections or flying pressure fluids or
dry surfaces lack of oxygen
objects gases
Minimum requirements for plant on Hutchinson Builders Sites: (tick that the applicable documentation has been sighted)
Plant to conform to manufacturer’s specifications and Plant Regulations
Plant Log Book detailing service history in accordance with Manufacturer’s specifications should be written legibly in English
Contractor must produce proof of competence of operator, e.g., Certificate of Competence, Licence, and detailed Log Book
I hereby confirm that the above risk assessment of the plant has been undertaken to form an opinion that the plant is fit
for purpose;
• From the above results of the assessment and inspection above;
• Plant is maintained to a scheduled maintenance program, in accordance with the manufacturer’s recommendations;
Records of this schedule can be viewed at: Site Office On Plant In Cabin of Plant
I/we are fully aware of the responsibilities under State WHS Legislation in relation to plant assessment requirements.
Signed by person doing the assessment - Operator / Employer:
Name: Position: Date:
Reviewed and accepted for plant to be used on site by Hutchinson Builders Site Management:
Name: Position: Date:
Accepted Site compliance sticker attached to plant
Accepted with Conditions:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.