Hutchinson Builders – ABN:52 009 778 330
Work Health & Safety Management Plan
Appendix 8 – Emergency Response Plan
Version: 9.1
provide medical treatment and extraction procedures required to safety and effectively
remove the injured worker/s from the incident scene back - by either,
b. Accessing the First Aid Box secured to the Jump, through a purpose made opening in the
side of the Jump Form then hoisted by the crane down to ground floor to awaiting
ambulances – or,
c. By lowering the stretcher through and down from a purpose made opening in the side of
the Jump to the live deck and then back to the Hoist and then take the worker by stretcher
back down to the ground floor to the waiting ambulance/s.
From different levels from within the tower
a. Emergency services enter the Hoist at ground level and are then taken up to the relevant
floor level where the injured worker is situated then after medical treatment is provided
the worker/s is then stretcher conveyed back onto the Hoist and down to the ground level
to awaiting ambulance/s.
In case of loss of power or Common Plant break down
a. Emergency services enter the stair well at ground level and then walk up to the relevant
floor levels where the injured worker/s is situated then after medical treatment is provide
the worker/s is then stretcher conveyed back down to the ground level to awaiting
ambulance/s – then,
b. Review working levels that are affected by power loss or break down to maintain working
activities 4 levels above or below ground floor.
From different levels of the basements
a. Emergency services enter at ground level and either walk or drive down to the relevant
basement levels where the injured worker/s is situated then after medical treatment is
provide the worker/s is then stretcher conveyed or driven back up to the ground level to
awaiting ambulance/s.
From the Crane Cab and Machine Deck
a. Emergency services/fire and rescue service from the live deck - access the crane cab and
deck via the mast ladders and hatches until they reach the injured worker/s where they
will provide medical treatment and extraction procedures required to safety and
effectively remove the injured worker/s from the incident scene back to the live deck then
to the waiting Hoist - and then stretcher conveyed them back down to the ground floor to
the waiting ambulance/s.
Page 8 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.