                                                                            Hutchinson Builders – ABN:52 009 778 330

                                                    Work Health & Safety Management Plan
                                                                          Appendix 8 – Emergency Response Plan
                                                                                                          Version: 9.1


In Case of Inclement Weather affecting Hoist Operation
Working 4 levels above Hoist Stop
            a. Emergency services enter the Hoist at ground level and are then taken up to the relevant
                floor level for operating the Hoist – then,
            b. Emergency services walk up the stair well to the relevant floor level where the injured
                worker/s is situated then after medical treatment is provided the worker/s is then
                stretcher conveyed back down to the Hoist working level, onto the Hoist and down to
                awaiting ambulance/s.

In Case of Inclement Weather causing the Crane Only to Stop and Hoist still Operating
To top live Working Deck
            c. Notify the Hoist operator of the situation - to dispose of the load and bring the Hoist car
                down to the ground floor – to wait for emergency services/fire and rescue to transfer
                personnel and equipment up to the live formwork deck – then,
            d. After medical treatment is provided the worker/s is then stretcher conveyed back down
                to the Hoist working level, onto the Hoist and down to awaiting ambulance/s.

From the Live Deck into Jump cells
            e. Emergency services/fire and rescue service from the live deck - access the Jump Forms
                cells or main jump deck via the trailing access stairs and hatches until they reach the
                injured worker/s where they will provide medical treatment and extraction procedures
                required to safety and effectively remove the injured worker/s from the incident scene
                back to either the waiting Hoist - and then stretcher conveyed them back down to the
                ground floor to the waiting ambulance/s.

The site management team will access the site’s capability on a regular basis, to maintain a functional
emergency access that requires access by emergency services to attend incidents and accidents on site –
refer to the Fire/Emergency Control Structure Procedure.




                                                                                                       Page 9 of 26

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.