Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 63, section 1. The text section number identifies this passage in the reader.

                              HUTCHINSON BUILDERS | Established 1912


            Noise

                        Radios or amplified music will not be permitted on site
                        If jackhammers are required to be used they will be fitted with sound
                         attenuators if available. Compressors will also be sound attenuated.
                        The reversing of trucks along the access handle will be limited by providing
                         on-site turn-around facility whenever possible.

                Vibration

                                All piling methods will be non- vibratory and non-driven. Generally,
                                 a combination of systems involving CFA, Micro-piles and Screw-piles
                                 will be utilised.
                                Vibrating earth working equipment, such as road rollers, will not be
                                 used. Road base and earth will, where needed, be consolidated
                                 using a sheep’s- foot style compactor.
                                Vibration monitoring stations will be established prior to the
                                 commencement of the project.
                                A dilapidation survey of the neighbouring houses will be undertaken
                                 prior to the commencement of the project.

                Dust

                                Cutting and drilling of concrete will, whenever possible, be done
                                 ‘wet’.
                                Stockpiling of soil on site will be kept to a minimum and covered
                                 when necessary.

                Odours and Exhaust

                             Any motorised plant that produces exhaust fumes will be located
                              away from the neighbouring property boundaries.
            d. Workers Induction
                           Before commencing each worker will be inducted to site in
                              accordance with the builder’s internal procedure and workplace
                              law. Part of the process will include a signed acceptance by the
                              worker of the site rules. The site rules will include a summary of the
                              Construction Management Plan and Traffic Management Plan.



Attachments

                Site Plan with Loading Areas




M.J.Leeke                                                                                       Page 2

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.