Skip to the record
The only place to find full transcripts.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 65, section 1. The text section number identifies this passage in the reader.

HUTCHINSON BUILDERS | established 1912

C) Plan Overview per attachments

A MUTCD compliant Traffic & Pedestrian Plan for two phases of construction

Proposed route for heavy vehicles with holding areas designated

Proposed facility for bus parking and traffic control personnel amenities

Proposed facility for transport, day to day car parking, material lay down, accommodation
and overnight bus parking

5. Provision for loading and unloading of vehicles within the site

PYNEP

D) Plan Proposal

The applicant acknowledges the MCU prohibition of workers parking their cars in the streets
surrounding the site. It proposes to manage this by the following:

1, Establishment of a remote compound and car park on suitable road reserve. (See Off Site
Parking Plan) The location and suitability of the site has been arrived at in consultation with
the council's technical officer, Martin Sergus. The compound will serve to alleviate
congestion in Seaview Tce resulting from material deliveries by semi- trailer. It will also
provide lunch and toilet facilities.

2. Asmall bus will transport workers to and from the compound and to site.

3. The bus will be parked in Seaview Tce on road reserve during the day. The location and
suitability of the parking area has been arrived at in consultation with Martin Sergus. (See
Bus Parking Plan) Outside of working hours the bus will be parked at the remote compound.

The applicant acknowledges that passageway along end the section of Seaview Tce. is constricted
due to the narrowness of the road, permitted car parking along the western side, and lack of
trafficable verge. The constriction is such that an ill-parked car will prevent truck access. The
applicant proposes to manage this by:

1. 1 Traffic contro! in accordance with the MUTCD compliant Traffic & Pedestrian Plan
attached.

2. Demarcation of the street parking from the carriageway by means of line marking
and signage.

E) Attachments

Heavy Vehicle Route & Holding Plan
Compound & Off Site Parking Plan

Bus Route Plan

Daytime Bus Parking Plan

MUTCD compliant Traffic & Pedestrian Plan

NN rr

M.].Leeke Page 2

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.