Fee Proposal


3.0        GENERAL NOTES

      1. Monitoring points have been established on all accessible and clearly visible sections of the
          site.
      2. Additional monitoring points to be established on block wall along boundary of Lot 5 on
          RP197117 once site vegetation has been cleared.
      3. Lot 6 on RP197117 will have monitoring stations established once access to site is granted and
          site vegetation has been cleared.
      4. All monitoring points have been fixed to structural elements avoiding facia and cladding
          where possible.
      5. Results for all subsequent monitoring rounds are to be issued within 24 hours of monitoring
          taking place
      6. Expected accuracies for the monitoring campaign (+/- 3mm horizontal and vertical
      7. Instrumentation to be used: Fully calibrated Trimble S6 3” instrument (3” angle and +/- 2mm +
          2ppm for distance
      8. All of our instruments have been tested against Department of Natural Resources EDM ranges
          and the associated EDM calibration certificate is attached for your reference.
      9. Redundant monitoring stations have been established outside of the proposed zone of
          influence to assist in quality assurance of deliverables
      10. All monitoring rounds are to be undertaken on site at a similar time of day and at periods
          when no heavy machinery is in operation on site. This will minimize the effects of material
          expansion and vibration.


4.0        APPENDICES

      A.   Monitoring Spreadsheet 1
      B.   Monitoring Spreadsheet 2
      C.   BBED34 – UPG Calibration Certificate
      D.   BBED34 – EDM Calibration Certificate

5.0        CONCLUSION

Please do not hesitate to contact us on (07) 5438 8104 if you would like to discuss anything further in
relation to this document, its appendices or the project specifically.

Yours faithfully

BENNETT + BENNETT



BEN MADDEN-HOLMES
Partner | Sunshine Coast Manager




                                                                                                          5

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.