Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 80, section 1. The text section number identifies this passage in the reader.

             Client: Hutchinson Builders
             Project: 71 Seaview Terrace, Sunshine Beach
             Title: Monitoring of adjoining structures


             See Monitoring Layout Sketch for location of monitoring points



             NOTES:
             1) All residuals are differences from base observation. Easting, Northing and Elevation residuals are shown in metres (to 3 decimal places) and are
             within +/- 3 mm as per instrument specifications.
             2) A negative elevation difference refers to an increase in the reduced height of the Monitoring Point

                                                                                               Lot 2 on RP189884 (Brick Wall)                                                                                                         Lot 5 on RP197117 (Pool Structure)                                                                                                        Lot 5 on RP197117 (Block Retaining Wall on boundary)
                                                         M1 (Prism)                                      M2 (Prism)                                      M3 (Prism)                      M4 (Prism)                      M5 (Prism)                                        M6 (Prism)                      M7 (Prism)                      M8 (Retro)                          M9 (Retro)                                   M10 (Retro)                                     M11 (Retro)
  Date              Descriptor
                                            East           North          Elevation         East           North          Elevation          East           North     Elevation   East     North      Elevation   East     North          Elevation         East             North      Elevation   East     North      Elevation   East     North      Elevation   East         North            Elevation            East             North            Elevation   East     North       Elevation
22/07/2016      Base rounds read            Base            Base              Base          Base            Base            Base             Base            Base       Base      Base      Base        Base      Base      Base             Base           Base              Base        Base      Base      Base        Base                                             Monitoring points not established. Awaiting clearing of vegetation on site.
                    Round 1

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.