Reference Monitoring &
Residual Risk Rating
Hazard & Risks Risk Assessment Control Measures
if Applicable to this
Review
Work Refers to WHS Document the person/s
Mark X
project
Document the control measures to be implemented in accordance with the
Consequence
Hierarchy of
Activity legislation, C.O.P, responsible for
Risk Rating
Likelihood
Identify and document the HIERARCHY of CONTROLS
Control
AS/NZS, monitoring the activity to
steps hazards associated with the Procedures / ensure compliance.
PPE
work activity. Elimination Substitution Isolation Engineering Administration
SWMS.
1 2 3 4 5 6
A 5 E25 5
Licensed Asbestos Removalist (with the appropriate asbestos WHS Act Site Manager /
Asbestos Friable and non-
☐ Removal friable asbestos
removal certification) will be used for the removal of asbestos.
2011 Part 2
WHS Reg
Asbestos Removalist
5 Licences / permits / notifications (as relevant) will be checked
Exposure to asbestos 2011
at time of review of the asbestos removal plan. Chapter 8
resulting in lung
5 A copy of the relevant asbestos register (inclusive of relevant Vic OH&S
disease
risk assessments) will be provided to the Asbestos Removalist. Act 2004
(mesothelioma etc.). Part 6
5 The Asbestos Removalist will be provided with the specific
Vic OHS Reg
requirements of the asbestos removal as per the COP for Safe Part 4 .3 Div.
Removal of Asbestos. 5
5 The asbestos removal site will be clearly defined to ensure that How to
non-essential persons do not enter and to warn person that safely
remove
asbestos removal work is being carried out.
asbestos
5 The Asbestos Removalist will be required to provide an COP 2011.
Asbestos Removal Plan specific to the site. (QLD, NSW,
The Asbestos Removal Plan will addresses the following (as SA
detailed in the COP - Safe Removal of Asbestos): How To
Manage and
- Details of the ACM to be removed (e.g. the location(s), Control
whether it is friable or non-friable, type, condition and Asbestos In
the quantity to be removed); The
- Responsibilities for removal; Workplace
COP 2011
- Program of commencement and completion dates; (QLD,
- Emergency plans; NSW,SA
- Asbestos removal boundaries, including the type and Managing
extent of the isolation required and the location of any Asbestos In
Workplace
signs and barriers;
VIC
- Control of electrical and lighting installations; Compliance
- PPE to be used, including respiratory protective Code 2008
equipment; Removing
- Details of air monitoring program; Asbestos In
Workplace
- Waste storage and disposal program; VIC
- Methods for removing the ACM (wet or dry methods); Compliance
- Asbestos removal equipment (spray equipment, Code 2008
asbestos vacuum cleaners, cutting tools, etc.);
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.