                                                                   -   Details on required enclosures including details on         How to
                                                                       their size, shape, structure, etc., smoke testing            manage and
                                                                                                                                    control
                                                                       enclosures and the location of negative pressure             Asbestos In
                                                                       exhaust units;                                               The
                                                                   - Details on temporary buildings required by the                 Workplace
                                                                       asbestos removalist (e.g. decontamination units)             COP
                                                                                                                                    2012(TAS,
                                                                       including details on water, lighting and power               NT)
                                                                       requirements, negative air pressure exhaust units and       How To
                                                                       the locations of decontamination units;                      Safely
                                                                   - Other control measures to be used to contain asbestos          Remove
                                                                       within the asbestos work area;                               Asbestos
                                                                                                                                    COP 2012
                                                                   - Detailed procedures for workplace decontamination,             (TAS, NT)
                                                                       the decontamination of tools and equipment, personal
                                                                       decontamination and the decontamination of non-
                                                                       disposable PPE and RPE;
                                                                   - Methods of disposing of asbestos wastes, including
                                                                       details on the disposal of:
                                                                             o Disposable       protective    clothing   and
                                                                                equipment, and
                                                                             o The structure(s) used to enclose the removal
                                                                                area.
                                                           1    Removed asbestos materials will not be reused in the                                   Site Manager /
                                                                construction in any way.                                                               Asbestos Removalist
                                                           5   Third party air monitoring and sampling will be carried out to                          Site Manager /
                                                               ensure minimum health and safety standards for the duration                             Foreman
                                                               of any asbestos removal work.
                                                           5   A clearance certificate will be obtained from the Asbestos                              Site Manager /
                                                               Contractor on completion of any asbestos removal work prior                             Foreman
                                                               to re-entry to the asbestos removal area.
                                                           5   All dumping receipts for asbestos products will be obtained                             Site Manager /
                                                                from the Asbestos Contractor.                                                          Asbestos Removalist
                                                           5   Hutchinson Builders asbestos checklist will be completed prior                          Site Manager /
                                                               to the commencement / recommencement of site work.                                      Foreman
                                                           5   The relevant asbestos register will be updated following the                            Asbestos Removalist
                                                               asbestos removal work.

                                           C   4    E18    4   (specify insects) are a particular hazard on this site and          WH&S Act      D2   Site Manager /
    Biological    Exposure to Insects,
☒   Hazards        Snakes, Animals &                           pesticide spraying will be undertaken
                                                                                                                                
                                                                                                                                    2011 Part 2
                                                                                                                                    Vic OHS Act   L5
                                                                                                                                                       Foreman
                   Infectious Substances                   6   Workers will be encouraged to wear long sleeved shirts and           Part 3             Site Manager/ All
                                                               long pants and insect repellent to prevent mosquito bites.                              personnel
                                                           5   Any sighting of snakes will be reported to site management.                             All personnel
                                                   WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                                                        Page 6

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.