- Details on required enclosures including details on How to
their size, shape, structure, etc., smoke testing manage and
control
enclosures and the location of negative pressure Asbestos In
exhaust units; The
- Details on temporary buildings required by the Workplace
asbestos removalist (e.g. decontamination units) COP
2012(TAS,
including details on water, lighting and power NT)
requirements, negative air pressure exhaust units and How To
the locations of decontamination units; Safely
- Other control measures to be used to contain asbestos Remove
within the asbestos work area; Asbestos
COP 2012
- Detailed procedures for workplace decontamination, (TAS, NT)
the decontamination of tools and equipment, personal
decontamination and the decontamination of non-
disposable PPE and RPE;
- Methods of disposing of asbestos wastes, including
details on the disposal of:
o Disposable protective clothing and
equipment, and
o The structure(s) used to enclose the removal
area.
1 Removed asbestos materials will not be reused in the Site Manager /
construction in any way. Asbestos Removalist
5 Third party air monitoring and sampling will be carried out to Site Manager /
ensure minimum health and safety standards for the duration Foreman
of any asbestos removal work.
5 A clearance certificate will be obtained from the Asbestos Site Manager /
Contractor on completion of any asbestos removal work prior Foreman
to re-entry to the asbestos removal area.
5 All dumping receipts for asbestos products will be obtained Site Manager /
from the Asbestos Contractor. Asbestos Removalist
5 Hutchinson Builders asbestos checklist will be completed prior Site Manager /
to the commencement / recommencement of site work. Foreman
5 The relevant asbestos register will be updated following the Asbestos Removalist
asbestos removal work.
C 4 E18 4 (specify insects) are a particular hazard on this site and WH&S Act D2 Site Manager /
Biological Exposure to Insects,
☒ Hazards Snakes, Animals & pesticide spraying will be undertaken
2011 Part 2
Vic OHS Act L5
Foreman
Infectious Substances 6 Workers will be encouraged to wear long sleeved shirts and Part 3 Site Manager/ All
long pants and insect repellent to prevent mosquito bites. personnel
5 Any sighting of snakes will be reported to site management. All personnel
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.