5 Workers will not to handle / move snakes / wildlife / spiders. All personnel
5 Any snake / spider / animal bites / scratches will be reported All personnel
to site management.
5 Specialist animal handlers will be used to move / handle Site manager or
identified animal / snake hazards. foreman /
5 The procedures for animal / insect / snake management will HSO at Induction
be communicated to all persons working onsite during the
induction.
5 First aid personnel will apply universal precautions / standard First Aid Officers
precautions when providing first aid.
5 Spills of blood and other bodily substances will be treated as Site Manager / HSO
potentially infectious and cleaned up in accordance with the
First Aid COP (applicable to state). (I.e. Use of PPE, disinfection
and isolation of area)
3 Spills of blood or other bodily substances will be immediately HSO / First Aid
barricaded to prevent persons from walking / tracking through Officers
the spill.
C 3 H13 5 Tasks involving brick and block work are to have an approved Masonry D3 Site manager or
Block Walls Wall collapse
☒ / Brick
SWMS in place. Wall Guide
2010 M9 foreman /
fall from height
Walls 4 Blade/single walls must be braced as per engineering and or AS 3700 Site manager or
Masonry
falling objects masonry guide details. foreman /
Structures
Health effects from 4 Return/tied and cross walls should be braced in accordance Site manager or
extended exposure to with engineering details until core filled and or required foreman /
concrete mortar strengths have been reached.
2 Certified scaffold and or work platforms to be used when Site manager or
injury to worker from
working at heights. foreman /
incorrect use of saw
cutter 4 Compliant edge protection consisting of handrail 900mm Site manager or
midrail 450mm and toe board 150 to 250mm must be in place foreman /
plant colliding with
for work 2m and above or via risk assessment if under 2m. A 2
temporary bracing
m exclusion zone to be established during works
manual handling 4 Mesh guard to be installed if risk of falling objects could occur. Site manager or
injuries Safe access to working platform must be in place foreman /
Haz subs If a ladder is used it must be fixed and secured extend 1m pass Site manager or
platform be for commercial use with min 120kg rating. foreman /
Effects from sun
exposure 3 Plant movement paths and exclusion zones are to be Subcontractor
established on and around walls that have been braced.
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.