                                                             After concluding all work in the confined space, access is to be                            HSO or Foreman /
                                                         3   restricted by way of:                                                                       Subcontractor
                                                         5         barricading; or
                                                                   Signage and other suitable means of exclusion.
                                                         5   No entry into a confined space is to be permitted unless the
                                                             completed Confined Space Entry Permit has been:
                                                             a. authorised by the Subcontractor Representative; and,
                                                             b. Validated for the duration of the entry by an authorised
                                                                 representative of Hutchinson.
                                                         5   Appropriate emergency planning is documented for each
                                                             confined space prior to entry and rehearsed.
                                                         4   All openings for entry to / egress from a confined space will
                                                             be of adequate size to permit the rescue of persons in the
                                                             space and the openings will not be obstructed by fittings or
                                                             equipment that could impede the rescue of person otherwise
                                                             another suitable means of rescue is provided.
                                                         5   Hutchinson Builders Confined Space Permit – checklist to be
                                                             completed prior to work starting.


                                                         5   All tasks involving concrete pumping will have an approved          WHS Reg 2011
    Concrete    Deficient or faulty     C   4    E18                                                                                              D4    Site Manager /
☒   Pumping      pump and                                    SWMS in place.
                                                                                                                                  Chapter 5
                                                                                                                                 VIC OHS Act      H14   Subcontractor
                 equipment.                              5   Logbook for the equipment detailing all inspections, tests,          2004 Part 3
                Exposure to fumes                           repairs and modifications will be viewed prior to pour.            • Concrete
                                                                                                                                  pumping -
                 from exhaust                            5   Prior to a major pour commencing a realistic assessment of the
                                                                                                                                  Victoria
                Dermatitis through                          time of completion will be completed which allows for                industry
                 excessive contact                           weather, accessibility, volume of concrete, slab and site            standard 2004
                                                             limitations, kibble back up, restricted work times, equipment      • Concrete
                 with concrete                                                                                                    Pumping QLD
                                                             back-up, equipment capacity, concrete pumper’s capacity,
                Impact of pipelines                                                                                              COP 2005
                                                             hose-hand’s limitations and the concrete supplier’s                • Managing The
                 and boom with
                                                             requirements.                                                        Risks Of Plant
                 structure, scaffold
                                                         5   Each pipe, bend or reducer will be marked with a non-                In The
                 and personnel                                                                                                    Workplace
                                                             removable number (which is recorded in the log book) if the
                Concrete being                                                                                                   QLD COP 2013
                                                             number can’t be seen readily it will be presumed that the          • Managing the
                 pumped prior to all
                                                             equipment is untested and is unsafe to operate.                      risks of plant
                 formwork                                                                                                         in the
                 preparations                            5   Concrete pump will be located in the most favourable position
                                                                                                                                  workplace
                                                             to pump concrete, including allowing visual contact for pump
                Exposure to excessive                                                                                            NSW COP
                                                             operator with both the pump and pour area and having clear,          2014
                 noise levels.
                                                             level area of ground with a firm base capable of supporting the    • Plant VIC COP
                                                             pump unit.                                                           1995
                                                                                                                                • Safeguarding
                                                         5   Compressed air or water lines will be sited in a way that avoids     Of Machinery
                                                             damage and complies with the AS.
                                                 WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                                                          Page 11

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.