Original PDF page 97, section 1. The text section number identifies this passage in the reader.

                                                          5   A ‘pump washout area’ will be clearly defined complying with
                                                              environmental protection legislation and local authority
                                                              requirements.
                                                          5   Controls will be implemented to collect concrete residue and
                                                              prevent wash down residue from entering stormwater drains.
                                                          3   For permanent / semi-permanent set up areas for the
                                                              concrete pump, lines will be painted (or similar) to define the
                                                              area and clear access allowed to the area and adequate
                                                              lighting provided.
                                                          5   Concrete pump areas will be sign posted “Danger – Concrete
                                                              Pumping Area – Authorised Persons Only”
                                                          5   The boom pumps will be set up with regard to the minimum
                                                              distance requirements to power lines, wind conditions and the
                                                              presumption that all power lines etc. are live unless they are
                                                              positively identified to be isolated and a certificate has been
                                                              issued stating the same.
                                                          5   Controls will be put in place to protect persons during line
                                                              cleaning activities.
                                                          4   For deck area concreting; perimeter guard railing will be in
                                                              place, proper access (at least 2 planks wide) provided, in
                                                              confined areas electric vibrating machines used (or fire
                                                              extinguishers in place where petrol driven machines in use)
                                                              and appropriate lighting provided.
                                                          5   Persons who are not appropriately qualified / do not hold the
                                                              appropriate certification will not be allowed to undertake
                                                              tasks for which those qualifications / certifications are
                                                              required.
                                                          5                                                                                                   Team Member
                                                              Operator’s certification (licence) for concrete pump operation
                                                                                                                                                              Conducting
                                                              is to be sighted, copied (where there is a facility) at induction.
                                                                                                                                                              Induction


                                                          5                                                                         WHS Reg 2011
    Contracted    Contact with Power     C   4    E18        All tasks involving crane activities will have an approved SWMS                           D4    Site Manager /
☒   Crane          lines.                                     in place.
                                                                                                                                     Chapter 5,
                                                                                                                                     Chapter 6 and      H14   Subcontractor
    Activities                                            5   Where persons are required to be licensed to operate cranes            S274
                  Collision with other                                                                                             VIC OHS Reg              HSO at Induction
                                                              on site, their certification will be sighted and copied (where         2007 Part 3.5
                   cranes / structures.
                                                              there is a facility) at induction.                                    Mobile Cranes
                  Crane collapse.                        5   Persons who are not appropriately qualified / do not hold the          QLD COP 2006             Site Manager
                                                              appropriate certification will not be allowed to undertake            Managing the
                  Roll over.                                                                                                        Risk of Plant in
                                                              crane operation tasks for which those qualifications /
                                                              certifications are required.

                                                  WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                                                               Page 13

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.