5 A ‘pump washout area’ will be clearly defined complying with
environmental protection legislation and local authority
requirements.
5 Controls will be implemented to collect concrete residue and
prevent wash down residue from entering stormwater drains.
3 For permanent / semi-permanent set up areas for the
concrete pump, lines will be painted (or similar) to define the
area and clear access allowed to the area and adequate
lighting provided.
5 Concrete pump areas will be sign posted “Danger – Concrete
Pumping Area – Authorised Persons Only”
5 The boom pumps will be set up with regard to the minimum
distance requirements to power lines, wind conditions and the
presumption that all power lines etc. are live unless they are
positively identified to be isolated and a certificate has been
issued stating the same.
5 Controls will be put in place to protect persons during line
cleaning activities.
4 For deck area concreting; perimeter guard railing will be in
place, proper access (at least 2 planks wide) provided, in
confined areas electric vibrating machines used (or fire
extinguishers in place where petrol driven machines in use)
and appropriate lighting provided.
5 Persons who are not appropriately qualified / do not hold the
appropriate certification will not be allowed to undertake
tasks for which those qualifications / certifications are
required.
5 Team Member
Operator’s certification (licence) for concrete pump operation
Conducting
is to be sighted, copied (where there is a facility) at induction.
Induction
5 WHS Reg 2011
Contracted Contact with Power C 4 E18 All tasks involving crane activities will have an approved SWMS D4 Site Manager /
☒ Crane lines. in place.
Chapter 5,
Chapter 6 and H14 Subcontractor
Activities 5 Where persons are required to be licensed to operate cranes S274
Collision with other VIC OHS Reg HSO at Induction
on site, their certification will be sighted and copied (where 2007 Part 3.5
cranes / structures.
there is a facility) at induction. Mobile Cranes
Crane collapse. 5 Persons who are not appropriately qualified / do not hold the QLD COP 2006 Site Manager
appropriate certification will not be allowed to undertake Managing the
Roll over. Risk of Plant in
crane operation tasks for which those qualifications /
certifications are required.
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.