Skip to the record
Accept no substitutions.

Original source · versioned page text

Operational Plan 2025-2026

of 26

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Text sections not matched to the original PDF pages. See original document to check page numbers.

                                                                                                          DRAFT OPERATIONAL PLAN 2025 - 2026


       4.8.1     Complete the Disaster Recovery Infrastructure program to reinstate infrastructure impacted by the March 2025 Infrastructure
                 western front storm event.                                                                                   Services
       4.8.2     Continue to improve strategic and corporate climate risk management, as well as through investigation of annual Strategy &
                 carbon accounting and new standards for ESG and climate-related reporting.                                      Environment

       4.8.3     Continue implementation of the Regional Climate Action Roadmap in partnership with Sunshine Coast Council Strategy &
                 including through the trialling of community resilience building workshops and the Climate-wise Communities Environment
                 program.
       4.8.4     Prepare an ongoing management program for high-risk erosion prone areas of the Climate Change Adaption Infrastructure
                 Plan (CHAP).                                                                                           Services / Strategy
                                                                                                                        & Environment

       4.8.5     Deliver Disaster Preparedness, Resilience and Recovery activities to support Council and the broader Infrastructure
                 community.                                                                                           Services
       4.8.6     Progress the design for the replacement of the Main Beach Sea Wall to be more resilient to future climate events. Infrastructure
                                                                                                                                   Services
       4.8.7     Continue the implementation of the Coastal Hazards Adaptation Plan (CHAP), including planning for Living Strategy &
                 Foreshores Noosa, Coastal Wetland Restoration Project.                                                   Environment
       4.8.8     Advance flood resilience projects including updating the Noosa River Flood Study, Six Mile Creek Flood Study Strategy &
                 and Noosa Flood Management Plan.                                                                              Environment /
                                                                                                                               Infrastructure
                                                                                                                               Services
       4.9.1     Progress the development of a program of contemporary revenue diversification and a strategic investment Strategy &
                 approach for alternate revenue streams for Council including consideration of establishment of a Futures Fund Environment /
                 and mechanisms for visitor contribution.                                                                      Corporate
                                                                                                                               Services


Corporate Plan Performance Measures

       Improved community connections with First Nations peoples.
       Enhanced quality of life for Noosa’s residents (Liveability Survey).
       Council engages our community for all major engagement projects and clearly shows the community how their input has informed decision
        making.

Noosa Council                                                                                                                                Page 22
Log in to download the original file

Operational Plan 2025-2026(PDF, 826KB).pdf · 845 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.