Original source · versioned page text
Attachment 1 - Proposal Plans
Original PDF page 11, section 3. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnExisting aallow for all work required to make good.
.50
.68 .75
W
10 Silt Pit RL Top: 109.75
Phone Food & Drink
C
8.6 8 Recycling pipework as per 14. All materials shall be new, proven in service & suitable for the intended
R
08 10
0
9.6
1 7 IK 6
ES
IK Booth 8.8 Pre cast concrete silt pit complete
P.S. Z purpose.
ESWD
85
10
future Carwash Equipment
EW
10 Outlet
09.
TP
8 with H.D. grated cover.
sink
Suppliers drawings.
FSL 109.80
8.8 15. Testing & commissioning shall be carried out prior to practical completion
NBN
L1
10
RCW
FSL 109.80 to clearly demonstrate & record that the works efficiently meet the
FS
.75
Existing
FSL 109.80
ES
GWD
Drainage
09
specified performaces & have been successfully commissioned as a
Landscaping
conc slab
L1
Vending & Change
Pit
ESWD
FFL 109.08 fridge
complete & integrated installation.
FS
4 FFL 109.95
NBN
8.6 Secure
EW
10
GWD
ES
FSL 109.93
IK W
Plant SITE SPECIFIC SEWERAGE NOTES:
109.
C
fridge Storage R
20,000 L MIN
FS
Unit
FSL 109.05
Vac Bay 3
Area
20,000 L MIN Room
L1
80
GWD GWD GWD GWD
ESWD
sink
GWD
NBN
Reclaim Unit location as per 1. The equipment for the treatment of liquid trade waste is to be kept clean
ES
Recycle
7
09
8.8
G
.40
D
10
W
Car Wash equipment dwgs. and maintained (by ongoing removal of accumulated material from
W
0
D
G
8.8
0
8.6 Oil/Water Separator Treatment Capacity =
GWD
channels, silt traps and coalescing plate packs, and timely removal of
EW
10 TD
10
8
GWD
.57 8.8 Store Room Roof Water
ES
08 10
GW GW 7,200 L/hr MIN. Note: 2 No. Electrical accumulated solids from Silt Pits, Reclaim Pits & the Pewtrol/Oil
NBN
EX. 150mm Ø VC Sewer Pipe
D
ESWD
1
Vending
D
IK Roof Water 150mm FW Ø Grate within FWG Retention Tank diaphragm pumps mounted above floor Interceptor Pit by a licensed liquid waste contractor etc) in an efficient
WC GW
FSL 109.80
Store Room Retention Tank Oil/Water D GW
FSL 109.70 delivers oily waste water from Holding Pit to condition to the satisfaction of the Relevant Authority & must not be
GWD
Bike Rail
FSL 109.30 Height Bar bunded area. S S S S D
ES
VacoilIsland
.05
GW See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.