Original source · versioned page text
Attachment 1 - Proposal Plans
Original PDF page 11, section 4. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnabove ground mechanical water
Separator modified without approval in writing of the Relevant Authority.
09
Bench D GW
NBN
Site Boundary 40.213M, 82 ° 00' 50"
L1
6 Drainage D separator to be connected to waste oil 2. Spills/leaks should be cleaned up using dry cleaning methods.
EW
.5
ESWD
GW
FS
08
S
3 1 Pit STAFF STAFF D GW container & disconnector gully. 3. All liquid trade waste from the Auto Wash bays shall pass through a
ES
8.5
FSL 109.80
0 ORG DG GW D G
W
K1 8.7
8 Treatment system to be in accordance with series of Reclaim Pits (4 No. 4,000 L MIN). Effluent water from the
STAFF
I D D
S
FS
10 GW
NBN
Bike Rail
S
S S S S S S S S S S S S S S S S local Council & Water Authority Guidelines
L1
GW D
D
Reclaim Pits is to pass into the Petrol/Oil Interceptor Pit (4,000 L MIN)
09
3
ES
S
Wash Bay 1 for Trade Waste Discharges.
ESWD
.7 and then be discharged to the sewer property house connection drain
S
08
.20
Disabled
Bin Area
1
Oil/Water Separator to be located in a
EW
point.
AUTO BAY
S
FSL 109.85
WC
FSL 109.85
NBN
4 bunded area.
8.7 4. Each Dog Wash tub is to have a hair trap installed. The hair trap/s shall
Site Boundary 36.19M, 262 ° 01'
2
ES
10
.05
.5 Existing 12,000 MIN FSL 109.75
08 GWD GWD GWD GWD
ENTRY
S
FFL 109.17 be cleaned on a regular (weekly MIN) basis.
09
1
.49 2 x Stop
ESWD
L1
Holding Tank
G
EW EW 108 EW 5. Animal droppings, litter, etc. shall not be disposed of into the sewerage
W
FSL 109.80
EW
FS
S
EW EW
D
IK Valves
GWD
NBN
ES
system.
11,000 Litre MIN Holding Tank
G
EW
S
W
FS
6. All pumps, reclaim suction lines, conduits, venting, filters etc... are to be
D
FSL 109.15 S S S S S S S S S S S S S S S S S S S
FSL 109.15
To be cast under the paving slab complete with 2
L1
S
.10
installed as per the Hydraulic Engineers, Manufacturers details & Car
ESWD
GWD
09
Existing Spoon Drain
09
S
No. Class "D" heavy duty cast iron (or other
S
.10
L1
Wash Suppliers specifications. These are all to be specified during the
NBN
New Sewer
GWD
0
S
FS
8.7 approved cover) gas tight trafficable access covers.
S
S
GWD
10 S construction documentation stage.
0 Man Hole
S
8.7
GWD
10 S S S S S S S S S S S S S S S 7. Extension risers for Reclaim Pits or the Petrol/Oil Interceptor Pit shall be
EW
GWD
ESWD
S
made to fit the unit to the exact depth shall be 300mm MIN high.
S
NBN
GWD
FS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.