Council archive · source document
Development Application part 2 Report/Plans - MCU11/0254
Plans and drawings: the text below has words only, no drawings.
Very large file (41.8 MB): may take a few minutes to open.
Original PDF page 93, section 1. The text section number identifies this passage in the reader.
4.0 PREVIOUS APPROVALS
James Warren Associates previously prepared a Fire Management Plan for the parent site in
November 2007 for Ken Hicks & Associates Pty Ltd. The fire management plan contained
recommendations for fire management including (refer section 4 p10):
5m wide firebreaks at the interface of each fire management unit to provide physical
separation of management units during fuel reduction burns and to provide continuous
access for fire fighting vehicles;
Inclusion of fire hydrants for fire fighting;
Smoke management and public perception;
Education / Signage; and
Undertaking prescribed burning when pools of standing water are present to act as refuge
for frogs.
The proposed development outlined in the plans prepared by Reitsma together with the
recommendations contained within this report are considered to meet the intent of the bushfire
management plan prepared by James Warren and Associates.
5.0 RECOMMENDATIONS
5.1 Access for Fire Fighters
Access between the units and the adjoining bushland will be required by fire fighters in the
event that a wildfire threatens the development. Fire fighters will need access to either:
Suppress wildfire by direct attack (i.e. Extinguishing fire by hoses). Please not direct
suppression is only generally possible with low intensity fires: or
Undertake back burning activities to starve an approaching wildfire of fuel.
Access for fire fighters includes being able to run 30m hose lines between the bushland and
the adjoining town houses to suppress wildfire or control any back burning operations lit from
the edge of the fire control line. This will also require space to be available for fire vehicles to
back up to the edge of the control lines. These should be at numerous locations to enable
hoses to extend around the entire perimeter of the site. Please refer to typical Bushfire
Management schematic plan and section for locations. Please note that it is generally QFRS
practice to back-up trucks to areas of operation so that hose lines (located at the rear of the
vehicle) can be efficiently drawn and re-drawn and such that the vehicle is facing toward an
avenue of escape.
Please refer to typical Bushfire Management schematic plan and section for locations.
5.2 Construction of a radiant heat shield fence
To assist in attenuation of radiant heat flux emanating from a bushfire directly adjoining the
development a radiant heat shield fence is to be constructed between the buildings and the
adjoining unmanaged vegetation. The fence is to be a 2000mm high solid non-combustible
fence such as colourbond or masonry. The fence should be flush with the ground surface so
as not to allow penetration of burning embers below the fence.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Report/Plans - MCU11/0254Related documentApplication case desk ↗
About this file
- File size
- 41.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.