STORMWATER MANAGEMENT REPORT
Address:     61 Elanda Street, Sunshine Beach
Applicant/Client: Bev Jenner Constuctions
1.       Background

Tod Consulting have been engaged to provide technical advice on the impacts of a proposed
development at 61 Elanda Street, Sunshine Beach. It is proposed to construct a duplex on the site. Tod
Consulting were also involved with a previous application for a similar development on the site in 2017.
As part of the previous application a Stormwater Management Plan (SWMP) was prepared by Aquaintel
Pty Ltd.

As the new Application is very similar in nature (and size) as the previous application that was approved
by Council it is proposed to undertake a catchment comparison with the original SWMP to guide the
detention requirements for this Application. Note that we have been in contact with Aquaintel and they
have no objections to us doing this.

2.       Catchment Comparison & Recommendation

As outlined in the attached tables and marked up plans there has been a minor increase in the southern
catchment compared to the previous application. As the change is in the order of 10% it is proposed to
increase the number of Atlantis Tanks on the southern side from 10 to 12 double tanks. Note that this
report along with Aquaintel’s original SWMP will be provided to the building hydraulics consultant to
ensure compliance with the requirements outlined in these two reports.

This report should be read in conjunction with Aquaintel report dated 3 August 2017 (copy attached),
the attached plans and tables prepared by Tod Consulting and Tod Consulting drawing reference 18505
– C001




Prepared by



Doug Reynolds (RPEQ 9072)
Tod Consulting Pty Ltd
26 February 2018




                                                                                                       1
17623 - 135 Lake Weyba Drive – Engineering Report – Rev B

Used in these records

About this file

File size
6.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Tod Consulting Stormwater Plans v2.pdf · 6.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.